EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (PIC), Javier Fontan (CESGA), Fco. Jose Bernabe (CESGA), Pablo Rey (CESGA), Gonzalo Merino (PIC), Javier Sanchez (IFIC), Adria Casajus (UB), Carlos Borrego (PIC), Dani Cano (IFCA), Mario David (LIP), Mohammed Kaci (IFIC) and Guillermo Losilla (BIFI).
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://services2.pic.org.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        * Javier Fontan reporting Site name: CESGA-EGEE Report period: 25/07/05 to 01/08/05 Operational Issues ================== * Friady 19th we had power problems that made us switch off service nodes this weekend. We hope to have it working today.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        * No one is connected * Site is OK
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        * Some problems reported. The SFT monitoring shows a couple of problems at the CNB site the last week: https://lxb2001.cern.ch:8443/sft/sitehistory.cgi?site=mallarme.cnb.uam.es -the first one, on the 26-27 july, when replica management errors were reported. -the second one, starting on the 30th July and still showing now: the monitoring system is not able to submit a job to the CNB. It seems that curently the site-GIIS for the CNB is not reachable: $ ldapsearch -x -H ldap://mallarme.cnb.uam.es:2135 -b mds-vo-name=cnblcg2,o=grid ldap_bind: Can't contact LDAP server Answer from Jose Valverde: It seems there must have been a new long power outage at our premises that outlasted UPS. I discovered that when I came in this morning and restarted the missing computers. That, for the record, is a side issue: these systems don't have auto-power on but for two of them whose mainboards have been hand-soldered to fix and that's why service restores only partially. BTW, we are planning on upgrading to Scientific Linux and hand installation of the latest release of middleware in the close future (not immediately), but we'll give notice in advance.
        Speaker: Jose R. Valverde (IFIC-CNB)
      • IFCA-LCG2 15m
        * Dani Cano reporting * Everything is OK.
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javier Sanchez reporting. * They managed to configure a worker node with quattor and they are waiting for quattor people to release templates for LCG 2.6 -- Weekly Operations Status Report: IFIC-LCG2 Reporting Period: 25/07/2005 to 31/07/2005 Availability of Core Services Hosted in the Site RB: lcg2rb.ific.uv.es (public use) [OK] RB: lcg2rb2.ific.uv.es (ATLAS production) [OK] BDII: lcg2bdii.ific.uv.es (test zone) [OK] BDII: isn04.ific.iv.es (ATLAS production) [OK] PROX: lcg2proxy.ific.uv.es [OK] Non-Functional Time 27th July from 15:00 to 19:00 Electric power maintenance in Campus Computer Center Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period None
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        * Reported by mail. Weekly Operations Status Report: INTA-CAB Reporting Period: 22/07/05 to 29/07/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 1 days. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 1 days. * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        * Reported by Mario Weekly Operations Status Report: LIP Reporting Period: 25/07/05 to 31/07/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt (will be reinstalled with LCG-2.6) LFC: se01.lip.pt Non-Functional Time ==================== [JS] 1 time, seems random, the SFT OK on the next time this happened with the RB lcgrb01.gridpp.rl.ac.uk [OK] 7 days Points to Raise at the Operations Meeting ========================================= Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC305 Points to Raise at the Operations Meeting ========================================= open bugs 2702 none ifae n/a Job submission failed
        Speaker: David, Mario
      • IFAE 15m
        * Carlos Borrego reporting Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 25/07/05 ] to [ 31/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: lcgce02.ifae.es,lcgbdii02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ none. Apel problem solved Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos
      • PIC 15m
        * Carlos Borrego reporting. * Carlos will upgrade this month. Weekly Operations Status Report: [ PIC ] Reporting Period: [ 25/07/05 ] to [ 31/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ce01.pic.es,bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: none Scheduled Down Time =================== - none Major Operational Issues Encountered During the Reporting Period ================================================================ Minor problems concerning rb01 and bdii. Problems solved. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        * Reported by mail. Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 23/07/05 ] to [ 29/07/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== 2005-07-24 18:05:05 to 2005-07-25 13:05:45 Problem with PBS. Scheduled Down Time =================== start 30th July 2005 - 10:00 end 30th July 2005 - 15:00 Change on electrical power system Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor.] By when will the WNs in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor. ] Installation with QUATTOR (without yaim) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * No report
        Speaker: Graciani, Ricardo and Casajus, Adrian
      • UPV-GRyCAP 15m
        * Reported by mail. Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 25/07/05 ] to [ 29/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> 1/2 day (29/07/05): Problems with the University Network Non-Functional Time ==================== - Total days unavailable: 1 days 25/07/05 -> 1/2 day: We had a problem with the conditioned air on Friday, and we had to switch off our CE till monday morning 29/07/05 -> 1/2 day: Problems with the University Network. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        The SFT monitoring pages report a couple of problems at the USC the last week: -The r-gma client test has been failing during the whole week. The error reported: https://lxb2001.cern.ch:8443/sft/info/lcg-ce.usc.cesga.es/sft_2005-07-30_18.05.57.html#sft-rgma_2005-07-30_18:14:56 seems to point at some library libxerces-c.so.25 missing on the lhcb26.usc.cesga.es node ... -There are also some replica management problems, that seem to come from the fact that the BDII to which the WNs are USC are pointing to is not reachable: LCG_GFAL_INFOSYS=lxn1178.cern.ch:2170
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
        * Guillermo Losilla reporting. * Aleatory failures from CESGA monitoring site. Weekly Operations Status Report: BIFI Reporting Period: 25/7/2005 to 29/7/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== All SFTs run by GOC were OK. Some SFTs run by CESGA failed, but most of them seems to be "false positives" since they failed as well in the rest of the sites of the federation: [CT] 2005-07-29 11:11:08 [JL] 2005-07-27 13:11:05 [JL] 2005-07-27 01:11:09 [CT] 2005-07-26 18:11:01 [CT] 2005-07-26 17:11:15 [CT] 2005-07-26 16:11:03 [CT] 2005-07-26 15:11:04 Some others failed due to lgc-utils tests which failed aleatory. We will investigate it. Scheduled Down Time =================== No scheduled down time intervals during the reporting period neither expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= LCG 2.6.0 has been released and according to the release notes [1]: "There is no longer a deadline for upgrading. The ROC managers will coordinate the upgrade in their region. Please clarify with them what the plan for moving to LCG-2_6_0 is.". So, which is the plan for the upgrade within our federation? :P [1] http://grid-deployment.web.cern.ch/grid-deployment/releaseNoteLCG-2.6.0.txt
        Speaker: Losilla Anadon, Guillermo (BIFI)
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From July 23 to July 29 == Summary == During this week there were no problems with the accounting system. By other hand, during this week IFAE has resumed to publish their accouting data. Without taking into account two sites that are having some problems, this is the status of accounting in the federation: * Sites publishing their data: 14 (100%) == Status of each SWE site == Site: BIFI Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. July 28 have published some records without this information Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: Since 23/07/05 Publishing User Name Information: Yes Actions: Check the Apel log files Other Comments: They have been in maintenance several days Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: Since 27/07/05 Publishing User Name Information: Yes Actions: Check the Apel log files Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Closed temporarlly
        Speaker: David, Mario (LIP)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        * Carlos reporting. * Only the fireman server was upgraded with a clean start. * The rest of the upgrade will come this week. * PIC will point to RGMA 1,2 at LIP.
        Speaker: Carlos Borrego (PIC)
        more information
      • CESGA 15m
        * Fco. Bernabe will start today the upgrade.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro on holidays, Javi Sanchez reporting. * All site upgraded to 1.2 but site is not functional (services running but untested).
        Speaker: Fernandez, Alvaro (IFIC)
      • LIP 15m
        * Mario reporting. * All upgraded to gLite 1.2 * Mario managed to send jobs to the CERN RB as they had already upgraded.
        Speaker: David, Mario (LIP)