EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE/PIC)
      more information
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://services2.pic.org.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • CESGA-EGEE 15m
        * On holidays. * Everything is OK.
        Speaker: Fontan, Javier
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 16/07/05 to 22/06/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ Due to a problem with Spain CRL our cluster was unusable during a sort period of time (< 1 hour) on 19/07/05 (around 13:00) Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Completed, now Scientific Linux 3.0.4 By when will the WNs in the Site be upgraded? Completed, now Scientific Linux 3.0.4 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier
      • CNB-LCG2 15m
        * No report * The SFT shows some replication problems.
        Speaker: No contact person
      • IFCA-LCG2 15m
        Weekly Operations Status Report: IFCA-LCG2 Reporting Period: 18/07/05 to 25/07/05 Availability of Core Services Hosted in the Site ================================================== RB OK BDII OK MyProxy OK Non-Functional Time ==================== none Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ Some warnings an CA-version now solved. Spureous Job submission failed on 22/07/05 solved by it's own, wich sugest a false possitive. New JS raised on 23rd and 24th with different afectation to the rest of the tests. The will be investigated as soon as I return to work on tuesday. Upgrade to Scientific Linux 3 (or equivalent) ============================================= done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Cano, Dani
      • IFIC-LCG2 15m
        * Javi Sanchez reporting. * Problem with the update of the Certification Revocation List. Affected all sites, not only IFIC! -- Weekly Operations Status Report: IFIC-LCG2 Reporting Period: 18/07/2005 to 25/07/2005 Availability of Core Services Hosted in the Site RB: lcg2rb.ific.uv.es (public use) [OK] RB: lcg2rb2.ific.uv.es (ATLAS production) [OK] BDII: lcg2bdii.ific.uv.es (test zone) [OK] BDII: isn04.ific.iv.es (ATLAS production) [OK] PROX: lcg2proxy.ific.uv.es [OK] Non-Functional Time None Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period None
        Speaker: Sanchez, Javier
      • INTA-CAB 15m
        Schedulled downtime until tomorrow.
        Speaker: Huedo, Eduardo
      • LIP-LCG2 15m
        * Mario reporting. * During the week there were some job submision failures reported in the SFT corrected automatically in the next test. This may point to a bug in the current release of the SFTs. Weekly Operations Status Report: LIP Reporting Period: 18/07/05 to 24/07/05 Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt LCG-BDII: ii02.lip.pt (will be reinstalled with LCG-2.6) LFC: se01.lip.pt Non-Functional Time ==================== [JS] 3 times, seems random, the SFT OK on the next time this happened with the RB lcgrb01.gridpp.rl.ac.uk [OK] 7 days Points to Raise at the Operations Meeting ========================================= Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Upgrade to Scientific Linux 3 (or equivalent) ============================================= All nodes in SLC305 Points to Raise at the Operations Meeting ========================================= open bugs 2702 none ifae n/a Job submission failed 2258 biomed pic 2005-04-22 Got a job held event, reason: Unspecified gridmanager 1909 biomed cnb.uam 2005-03-21 GlueSARoot losed for biomed VO
        Speaker: David, Mario
      • IFAE 15m
        All OK.
        Speaker: Borrego, Carlos
      • PIC 15m
        All OK.
        Speaker: Borrego, Carlos
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 16/07/05 ] to [ 22/07/05 ] Availability of Core Services Hosted in the Site ================================================== MyProxy [OK] VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== 11:36:14 07/18/05 to 11:57:19 07/18/05 Failure of net in UAM Scheduled Down Time =================== none Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor.] By when will the WNs in the Site be upgraded? [when the LCG-2_6_0 is OK for Quattor. ] Installation with QUATTOR (without yaim) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose
      • UB-LCG2 15m
        * Adria Casajus reporting * Network problems due to a power cut. Weekly Operations Status Report: UB Reporting Period: 18/07/2005 to 24/07/2005 Availability of Core Services Hosted in the Site ================================================ Non Core Service in the Site Non-Functional Time ==================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ Random power or network cuts on the university make the site unavailable for short period of times (30-60 minutes). In most cases they do not directly affect the LCG machines that keep running. Points to Raise at the Operations Meeting ========================================= None
        Speaker: Graciani, Ricardo and Casajus, Adrian
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 18/07/05 ] to [ 22/07/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> Some power Supply problems. Non-Functional Time ==================== - Total days unavailable: 2 days 19/07/05 - 20/07/05 -> Problem with PBS system. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ The GIIS Error: dn: GlueSARoot=dteam:dteam,GlueSEUniqueID=aker.dsic.upv.es,Mds-Vo-name=grycaplcg2,mds-vo-name=local,o=grid str2entry: invalid value for syntax 1.3.6.1.4.1.1466.115.121.1.27 Persists. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel
      • USC-LCG2 15m
        Weekly Operations Status Report: USC Reporting Period: 16/07/2005 to 22/07/2005 Availability of Core Services Hosted in the Site ================================================ None Deployed Non-Functional Time =================== None Scheduled Down Time =================== None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already there By when will the WNs in the Site be upgraded? Already there Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan
      • BIFI-LCG 15m
        * Guillermo Losilla reporting. * Incompatibility problem between iptables and the BDII. Since last Monday everything is working fine. * Accounting activated. FMON sensors in the worker nodes activated. * Some problems with multiple mapping from the same certificate to several VOs. Weekly Operations Status Report: [ BIFI ] Reporting Period: [ 18/7/2005 ] to [ 22/7/2005 ] Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== [CT] from 15-7-2005 to 18-7-2005 description: incompatibility between the lcg-bdii service running in the CE and our NATed WN. It is a bug already reported: https://savannah.cern.ch/bugs/?func=detailitem&item_id=8626 Scheduled Down Time =================== No scheduled down time intervals during the reporting period neither expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Losilla Anadon, Guillermo (BIFI)
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From July 16 to July 22 == Summary == During this week there were no problems with the accounting system. By other hand, during this week BIFI has started to publish their accouting data. So now this is the status of accounting in the federation: * Sites publishing their data: 13 (92.9%) * Sites with problems: 1 (7.1%) == Status of each SWE site == Site: BIFI Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: They have started to publish their accountint data Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. April 15 have not published the user name. Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: NO Missing Accounting Entries: Since 23/06/05 Publishing User Name Information: NO. The last published data has not this informatation Actions: Solved Problems of Last Report. JoinProcessor Reprocess Other Comments: None Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None == Accounting Support == Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Speaker: David, Mario (LIP)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (PIC)
      • PIC Report 15m
        Speaker: Carlos Borrego (PIC)
        more information
      • CESGA 15m
        * Today was holiday in Galicia
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * gLite 1.1 installed.
        Speaker: Fernandez, Alvaro (IFIC)
      • LIP 15m
        * Upgrading to gLite 1.2 * The installation instructions of 1.2 are the ones from 1.1. * In 1.2 there are more services to configure. * In 1.2 we have to know who will have to run the file transfer and file placement services for Oracle.
        Speaker: David, Mario (LIP)