Magnet powering system and beam dump requests

12 Apr 2005, 16:00
20m
40-SS-C01 (CERN)

40-SS-C01

CERN

Equipment and beam monitoring - connected to the beam interlocks Equipment and beam monitoring - connected to the beam interlocks

Speaker

Dr Markus Zerlauth (CERN)

Description

The objective is to safely extract the beam after quenches and failures in the powering or quench protection system. Failures could be detected by different systems, depending on the origin of the failure. The role of quench protection system, power converters and powering interlock systems will be discussed. Timescales for the extraction of the beams after different failure cases will be presented. Monitoring mechanisms to detect fast magnet current changes in critical electrical circuits will be addressed as a complement to the machine protection systems being presently in the baseline. This system will initiate the extraction of beams before the magnetic field in the magnet changes in a significant way. Combined failures could be equally covered by such a system, for example after a power cut due to thunderstorms.

Author

Dr Markus Zerlauth (CERN)

Presentation materials