EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (IFAE-PIC), J.R. Valverde (CNB-CSIC), David Garcia Aristegui (CNB-CSIC), Gonzalo merino (CIEMAT-PIC), Miguel Cardenas (CIEMAT), Mohammed Kaci (IFIC-CSIC), Javier Sanchez (IFIC), Alejandro Lamas (IFIC), Guillermo Losilla (BIFI), Juan Jose Saborido (USC), Pepe Salt (IFIC), Csrlos Borrego (PIC), Alvaro Fernandez (CSIC), Kai Neuffer (INTA), Goncalo Borges (LIP), Marc Rodriguez (PIC), Dani Cano (IFCA), Javi Lopez (CESGA), Mario David (LIP), Carlos Fernandez (CESGA), Fco. Bernabe (CESGA), Javier Palacios (IFIC).
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://services2.pic.org.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • BIFI-LCG 15m
        Weekly Operations Status Report: BIFI Reporting Period: 31/10/2005 to 4/11/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== No SFT run by GOC failed along the reporting period :P Scheduled Down Time =================== No scheduled down time during the reporting neither expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= None
        Speaker: Losilla Anadon, Guillermo (BIFI)
      • CESGA-EGEE 15m
        Weekly Operations Status Report: CESGA-EGEE Reporting Period: 29/10/05 to 04/11/05 Availability of Core Services Hosted in the Site ================================================== CESGAs RB, LB, VOMS server are working fine. Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 * Scheduled Maintenance During the Next Reporting Period 0 Major Operational Issues Encountered During the Reporting Period ================================================================ * The node cisn3.egee.cesga.es fell twice this week. It was rebooted both times (No jobs were running there, so it didn't cause any trouble). * Everything else is working fine. Upgrade to LCG 2.6.0 ==================== Already done Points to Raise at the Operations Meeting ========================================= None
        Speaker: Lopez, Javier (CESGA)
      • CIEMAT-LCG2 15m
        Weekly Operations Status Report: CIEMAT-LCG2 Reporting Period: 31/10/05 to 07/11/05 Availability of Core Services Hosted in the Site ================================================== There is no core services running at CIEMAT at this moment Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 * Scheduled Maintenance During the Next Reporting Period 0 Major Operational Issues Encountered During the Reporting Period ================================================================ During several days we were republishing all our accounting records. This was as a result of a misconfigured file (publisher-config-yaim.xml) It is now corrected. Upgrade to LCG 2.6.0 ==================== CIEMAT cluster is running LCG-2.6.0 Points to Raise at the Operations Meeting ========================================= None
        Speaker: Calonge, Javier (+34913466000 Ext: 6802) (CIEMAT)
      • CNB-LCG2 15m
        Speaker: David Garcia Aristegui (CNB)
      • IFCA-LCG2 15m
        Speaker: Cano, Dani (IFCA)
      • IFIC-LCG2 15m
        Speaker: Sanchez, Javier (IFIC)
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 31/10/05 to 04/11/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0.2 Days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ Problems with ce00.inta.es ("to much open files") untíl 31/10/2005 10:00. Solved by increasing /proc/sys/fs/file-max. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Neuffer, Kai (INTA)
      • LIP-LCG2 15m
        Weekly Operations Status Report: [ LIP-LCG2 ] Reporting Period: [ 29/09/2005 ] to [ 04/11/2005 ] Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt PX: px01.lip.pt LFC: lfc01.lip.pt Non-Functional Time ==================== [JS] 30 October and on 1-2 November Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ Same problems as last week. [JS] at LIP is due to the fact that although a slot is reserved for dteam jobs, they stay in the queue and fail in the end the SFT result.
        Speaker: David, Mario (LIP)
      • IFAE 15m
        Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 31/10/05 ] to [ 07/10/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ifaece02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - Several castor problems. Today jobs could fail while trying to write to castor. Fails on the SFT tests since saturday Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos (PIC)
      • PIC 15m
        Weekly Operations Status Report: [ PIC ] Reporting Period: [ 31/10/05 ] to [ 07/11/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - Several castor problems. Today jobs could fail while trying to write to castor. Fails on the SFT tests since saturday Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos (PIC)
      • UAM-LCG2 15m
        Weekly Operations Status Report: [ UAM-LCG2 ] Reporting Period: [ 29/10/05 ] to [ 04/11/05 ] Availability of Core Services Hosted in the Site ================================================== VOServer [OK] RB [OK] BDII [OK] Non-Functional Time ==================== * 16:28:58 10/28/05 GMT to 17:59:02 10/28/05 GMT --> ERROR Electrical failure in the University * 4 Nov 2005 09:15:59 to 4 Nov 2005 10:16:00 --> The process "pbs-server" on host "grid003.ft.uam.es" (linked to role ce- access-node) is OFF/DOWN. The torque service is down.I am looking which was the problem. Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= now UAM-LCG2 has lcg-2_6_0 release whith SL305 Points to Raise at the Operations Meeting ========================================= none
        Speaker: Pardo Navarro, Juan Jose (UAM)
      • UB-LCG2 15m
        * They are in schedulled downtime.
        Speaker: Graciani, Ricardo and Casajus, Adrian (UB)
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 31/10/05 ] to [ 04/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> 0 days Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel (tel. +34 963877007 ext 88254) (GRyCAP-ITACA (UPV))
      • USC-LCG2 15m
        Weekly Operations Status Report: [ USC-LCG2 ] Reporting Period: [ 29/10/2005 ] to [ 04/11/2005 ] Availability of Core Services Hosted in the Site ================================================== No Core Service Hosted. Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [ already done ] By when will the WNs in the Site be upgraded? [ already done ] Points to Raise at the Operations Meeting ========================================= The certificates of most of the sites in our region are going to expire the 10th of November !!
        Speaker: Saborido, Juan Jose
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From October 29 to November 4 == Summary == All sites have published their accounting data!! Only to mention that USC should set the republish option to "missing". Regarding CPU normalization: * CIEMAT and UAM should check their cputmult factors * UB should check their wallmult factor NOTE: LIP is wrongly reported as failing the test because they have not setup the wallmult factor but since the cputmult factor is 1 this is fine. We will try to improve the test to take into account this possibility. For further deails, please check the results of the SFT normalization tests in: http://mon.egee.cesga.es/sft/lastreport.cgi == Status of each SWE site == Site: BIFI Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: Other Comments: Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: 1/11/05 and 2/11/05 due to syslogd problems Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: They are restarting to publish their accounting data. Site: ifae Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: old accounting records lost due to logrotate Publishing User Name Information: Yes Actions: None Other Comments: Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: None Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: Set the republish option to missing Other Comments: == Accounting Support == * Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ * Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html * Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ * CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html * Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ * Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Sites which have deployed the sensor are: CESGA - OK IFAE - OK IFCA - OK IFIC - OK LIP - OK PIC - OK BIFI - OK. With problems. UPV - NOT DEPLOYED go to http://grid-mon.lip.pt/grid-mon/index.php and in case of doubts send mail to Mario. Network graphs show bandwidth evolution over time.
        Speaker: David, Mario (LIP)
      • 5.9.19.1 All sites to upgrade the gridice sensor in all machines 15m
        hay 3 sitios más que han actualizado el gridice sensor: CIEMAT, UAM, UB. La lista quedaría así: - Actualizados: BIFI, CESGA, CIEMAT, CNB, IFAE, LIP, PIC, UAM, UB, UPV, IFCA, IFIC, INTA and USC. IFCA - need to activate the publishing gridice information. UPV - Still using LCG 2.4. When they will upgrade to LCG 2.6 and they have to reinstall. Installation in worker nodes is optional for security issues.
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.11.7.1 All sites to check and renew their host certificates 15m
        * Last year some high number of certificates were created in November 11th, 2004 due to a new release of the spanish CA certificate. * Renewing certificates is an normal operational procedure but in this case should be watched and monitored. * No need to issue the command from the same host to be renewed. Just do it in your User Interface where the configuration files are usually up to date.
        Speaker: Pacheco, Andreu (IFAE-PIC)
      • 5.11.7.2 Deployment at IFIC of a new version of the user support web site 15m
        * To be announced soon. Test site is ready right now. Two weeks in operation. * Improved user and GGUS interface. * Many categories. * Authentification by certification.
        Speaker: Palacios, Javier (IFIC-CSIC)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (IFAE)
      • PIC Report 15m
        * Carlos reporting. * Problems with the gLite Computing Element. * SFT tests running.
        Speaker: Carlos Borrego (PIC)
      • CESGA 15m
        Fco. Bernabé reporting. * Upgrading to gLite 1.4 * Start working with common configuration files to easier new releases. Mario David and Gonsalo Borges will be the beta testers. They welcome also gLite 1.4 configuration files for other sites already upgraded.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro reporting. * No big changes. * SFTs working since last week. But many false positives. * gLite issue when sending to several VOs from the same user.
        Speaker: Fernandez Casani, Alvaro (IFIC)
      • LIP 15m
        * Mario David reporting. * Running gLite 1.3 * Plan to only upgrade to 1.4 when the release will be official. * Plan to add support dteam VO. * Plan to add support for diligent in the IO server.
        Speaker: David, Mario (LIP)
      • INTA-CAB 15m
        * Kai reporting. * Still configurating gLite. * Plan to complete this week.
        Speaker: Kai Neuffer (INTA-CAB)