EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (IFAE/PIC), Javier Sanchez (IFIC), Alejandro Lamas (IFIC), Javier Palacios (IFIC), Dani Cano (IFCA), Pablo Rey (CESGA), Javier Fontan (CESGA), Pepe Salt (IFIC), Javier Lopez (CESGA), Mario David (LIP), Mohammed Kaci (IFIC), Kai Neuffer (INTA), Alvaro Fernandez Casani (IFIC), Carlos Borrego (PIC), Gonzalo Merino (PIC), Marc Rodriguez (PIC), Fco. Bernabe (CESGA) Apologies: The CNB people are until the 15th november in the SC 05 Grid Workshop meeting presenting GROCK.
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://gridsite.pic.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • BIFI-LCG 15m
        Weekly Operations Status Report: BIFI Reporting Period: 7/11/2005 to 11/11/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== 3 SFTs run by GOC failed along the reporting period: [JS] 2005-11-08 07:05:26 It probably happened due to a unexpected network cut. [JS] 2005-11-09 10:06:18 This failure is related with the Spanish CA's CRL incident that happened 9th in the morning. [CT] 2005-11-10 22:06:27 Strange... Are random failures in the replica management tests back??? :S Scheduled Down Time =================== We arranged a scheduled downtime for today (friday 11th November) from 11h to 13h (GMT) due to electrical maintenance. No scheduled down time expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= None
        Speaker: Losilla Anadon, Guillermo (BIFI)
      • CESGA-EGEE 15m
        Template URL does not work. This last week we had a false positive at RM (10th Nov) and a Job Submission Failed (9th Nov) provably caused by the CRL update problem that the Spanish CA had last week.
        Speaker: Lopez, Javier (CESGA)
      • CIEMAT-LCG2 15m
        * No report.
        Speaker: Calonge, Javier (+34913466000 Ext: 6802) (CIEMAT)
      • CNB-LCG2 15m
        During the last days, the CNB site has been failing the SFT tests. From some of the error messages, it seems that the certificate of some of the hosts (baudelaire?) could have expired. We do not have any mail from you on friday with the weekly operations report, so we can not informa about the CNB status on the SWE federation weekly report. Could you please send us some information with the status report at CNB and issues last week? * CNB is in Schedulled downtime from today until 17th for maintenance tasks.
        Speaker: David Garcia Aristegui (CNB)
      • IFCA-LCG2 15m
        * Dani Cano reporting. * Nothing to report.
        Speaker: Cano, Dani (IFCA)
      • IFIC-LCG2 15m
        -- Weekly Operations Status Report: IFIC-LCG2 Reporting Period: 07/11/2005 to 14/11/2005 Availability of Core Services Hosted in the Site RB: lcg2rb.ific.uv.es (public use) [OK] RB: lcg2rb2.ific.uv.es (ATLAS production) [OK] BDII: lcg2bdii.ific.uv.es (test zone) ** some performance problems ** BDII: isn04.ific.iv.es (ATLAS production) [OK] PROX: lcg2proxy.ific.uv.es [OK] Non-Functional Time: None Scheduled Down Time * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period SFT tests failed on 9th-10th Novemnber (Job list match failed) due to a misconfiguration of the SFT tests @ CERN. Some rm failures on the SFT tests. We changed the BDII to point to isn04 until lcg2bii is replaced by another machine. We will do it today.
        Speaker: Sanchez, Javier (IFIC)
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period: 07/11/05 to 11/11/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ We received a ticket because of the ticket that the certificates were due to expire within 3 days. Problem was solved by updating tickets. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Neuffer, Kai (INTA)
      • LIP-LCG2 15m
        Weekly Operations Status Report: [ LIP-LCG2 ] Reporting Period: [ 05/11/2005 ] to [ 11/11/2005 ] Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt PX: px01.lip.pt LFC: lfc01.lip.pt Non-Functional Time ==================== [CT] on the 7 and on the 11 of November Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ [CT] was due that in some of our worker nodes the LCG_GFAL_INFOSYS were not update and were pointing to a bdii no longer in operation, problem was solved
        Speaker: David, Mario (LIP)
      • IFAE 15m
        Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 07/11/05 ] to [ 14/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ifaece02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - replica managemt fail on monday. General problem with castor. Fixed on monday afternoon Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos (PIC)
      • PIC 15m
        Weekly Operations Status Report: [ PIC ] Reporting Period: [ 07/11/05 ] to [ 14/11/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - Pbs server crashed on tuesday - replica managemt fail on monday. General problem with castor. Fixed on monday afternoon Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos (PIC)
      • UAM-LCG2 15m
        * No report.
        Speaker: Pardo Navarro, Juan Jose (UAM)
      • UB-LCG2 15m
        * No report. * Site is running fine.
        Speaker: Graciani, Ricardo and Casajus, Adrian (UB)
      • UPV-GRyCAP 15m
        Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 07/11/05 ] to [ 11/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> 0 days Non-Functional Time ==================== - Total days unavailable: 1 day (09/11/2005 Morning) -> Problem with the CE certificate and Datagrid CRL. (07/11/2005 Morning) -> Crash of one internal node of the CE Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0.5 day (10/11/2005 morning - Power supply interruption) * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel (tel. +34 963877007 ext 88254) (GRyCAP-ITACA (UPV))
      • USC-LCG2 15m
        Weekly Operations Status Report: [ USC-LCG2 ] Reporting Period: [ 05/10/2005 ] to [ 11/11/2005 ] Availability of Core Services Hosted in the Site ================================================== No Core Service Hosted. Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [ already done ] By when will the WNs in the Site be upgraded? [ already done ] Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan Jose
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From November 4 to November 11 == Summary == All sites have published accounting data during the week. 3 sites (CNB, IFCA and UAM) have problems Regarding CPU normalization: * CIEMAT and UAM should check their cputmult factors NOTE: LIP is wrongly reported as failing the test because they have not setup the wallmult factor but since the cputmult factor is 1 this is fine. We will try to improve the test to take into account this possibility. For further deails, please check the results of the SFT normalization tests in: http://mon.egee.cesga.es/sft/lastreport.cgi == Status of each SWE site == Site: BIFI Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: Other Comments: Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: November 9, 10 Publishing User Name Information: Yes. They have published some old records without this information Actions: Check apel logs Other Comments: Site: ifae Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: November 8, 9, 10, 11 Publishing User Name Information: Yes Actions: Check apel logs Other Comments: Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: Check apel logs Other Comments: Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: None Actions: None Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: November 11 Publishing User Name Information: Yes Actions: None Other Comments: Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: Set the republish option to missing Other Comments: == Accounting Support == * Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ * Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html * Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ * CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html * Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ * Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Sites which have deployed the sensor are: CESGA - OK IFAE - OK IFCA - OK IFIC - OK LIP - OK PIC - OK BIFI - OK. With problems. UPV - NOT DEPLOYED go to http://grid-mon.lip.pt/grid-mon/index.php and in case of doubts send mail to Mario. Network graphs show bandwidth evolution over time.
        Speaker: David, Mario (LIP)
      • 5.9.19.1 All sites to upgrade the gridice sensor in all machines 15m
        La lista quedaría así: - Actualizados: BIFI, CESGA, CIEMAT, CNB, IFAE, LIP, PIC, UAM, UB, UPV, IFCA, IFIC, INTA and USC. IFCA - need to activate the publishing gridice information. Mails exchanged with Dani Cano. problem SOLVED on 14 Nov 2005 during the meeting. UPV - Still using LCG 2.4. When they will upgrade to LCG 2.6 and they have to reinstall. Installation in worker nodes is optional for security issues.
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.11.7.1 All sites to check and renew their host certificates 15m
        * Last year some high number of certificates were created in November 11th, 2004 due to a new release of the spanish CA certificate. * Renewing certificates is an normal operational procedure but in this case should be watched and monitored. * No need to issue the command from the same host to be renewed. Just do it in your User Interface where the configuration files are usually up to date. * There is an open ticket for CNB Storage Element with expired certificate.
        Speaker: Pacheco, Andreu (IFAE-PIC)
      • 5.11.7.2 Deployment at IFIC of a new version of the user support web site (CLOSED) 15m
        * To be announced soon. Test site is ready right now. Two weeks in operation. * Improved user and GGUS interface. * Many categories. * Authentification by certification. * No problems active. Initial problems solved. * System declared as certified by IFIC! 14-11-2005
        Speaker: Palacios, Javier (IFIC-CSIC)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (IFAE)
      • PIC Report 15m
        * Carlos reporting. * All site updated to 1.4 * CE does not work, still under investigation.
        Speaker: Carlos Borrego (PIC)
      • CESGA 15m
        * Fco. Bernabe reporting. * Start upgrade to 1.4
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro reporting. * No big news. * Waiting for the SFT tests.
        Speaker: Fernandez Casani, Alvaro (IFIC)
      • LIP 15m
        * Mario David reporting. * Gonsalo and Mario have been working in the configuration. * This afternoon or tomorrow a mail will be sent to the list for discussion. * As last release was sent last friday, the configuration will support it. * They will be 15 VOs in the default configuration files. Sites must delete unwanted VOs.
        Speaker: David, Mario (LIP)
      • INTA-CAB 15m
        * Kai Neuffer reporting. * One WN, CE, RGMA, UI.
        Speaker: Kai Neuffer (INTA-CAB)