EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (IFAE-PIC), Carlos Borrego (PIC), Alejandro Lamas Davina (IFIC), Gonzalo merino (PIC), David Garcias Aristegui (CNB), Mario David (LIP), Mohammed Kaci (IFIC), Fco. Bernabe (CESGA), Pablo Rey (CESGA), Alvaro Fernandez Casani (IFIC), Guillermo Losilla (BIFI), Javier Lopez (CESGA), Kai Neuffer (INTA-CAB), Pepe Salt (IFIC), Javier Palacios (IFIC), Javier Sanchez (IFIC), Marc Rodriguez (PIC), Miguel Cardenas (CIEMAT)
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday if they want Gonzalo Merino to report with accuracy their status to EGEE Operations Meeting * Since the people from CERN is asking the ROCs to write the monday's 11 report following a sort of template, I think it will be useful that the SWE Site Reports that site managers are sending on friday to this list, try to follow a similar template as well. I suggest then that these reports are produced following the template available at: https://gridsite.pic.es/devel/download/txt/SR-SWE-Template.txt * Reports should be sent to: egee.swe.roc.contact@pic.es The reports from SWE are appended to the agenda page of the weekly operation meetings: http://agenda.cern.ch/displayLevel.php?fid=258
      Speaker: Merino, Gonzalo (PIC)
      • BIFI-LCG 15m
        Weekly Operations Status Report: BIFI Reporting Period: 14/11/2005 to 20/11/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== Several SFTs run by GOC failed along the reporting period: [CT] 2005-11-15 01:05:51 [CT] 2005-11-15 14:03:49 [CT] 2005-11-16 22:05:10 [CT] 2005-11-19 07:06:14 [CT] 2005-11-19 10:05:56 It seems the infamous random failures in the replica management tests are back; at least at our site. We will keep an eye on it, but it is difficult to debug/investigate a failure when the unique errors you get from an lcg command are just "Invalid argument" or "lcg_cr: Connection timed out". We think some effort to make those messages more verbose, should be done in order to solve this problem definitively. Scheduled Down Time =================== No scheduled down time during the reporting period neither expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= None
        Speaker: Losilla Anadon, Guillermo (BIFI)
      • CESGA-EGEE 15m
        * Javier Lopez reporting. * Problems with Tomcat hanging in the MOM_BOX. This makes R-GMA not operative. * At least INTA, LIP and UPV showed the same list of problems.
        Speaker: Lopez, Javier (CESGA)
      • CIEMAT-LCG2 15m
        * Miguel Cardenas reporting. * No problems.
        Speaker: Calonge, Javier (+34913466000 Ext: 6802) (CIEMAT)
      • CNB-LCG2 15m
        Weekly report of the CNB site - Problems with the SE certificate renewal (done) - R-GMA server updated - Still checking periodical problems with some LCG middleware commands (lcg-rm etc etc)
        Speaker: David Garcia Aristegui (CNB)
      • IFCA-LCG2 15m
        * No report. * Everything seems fine.
        Speaker: Cano, Dani (IFCA)
      • IFIC-LCG2 15m
        * Javier Sanchez reporting. * Castor failure. Problems with one disk in a Raid. Server rebooted. * Accounting not updated today.
        Speaker: Sanchez, Javier (IFIC)
      • INTA-CAB 15m
        The SFT monitoring shows an rgma test failure last week on the 16-11-2005 04:10 https://lcg-sft.cern.ch/sft/info/ce00.inta.es/sft_2005-11-16_04.06.04.html#sft-rgma_2005-11-16_04:10:16 Weekly Operations Status Report: INTA-CAB Reporting Period: 14/11/05 to 18/11/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.
        Speaker: Neuffer, Kai (INTA)
      • LIP-LCG2 15m
        Weekly Operations Status Report: [ LIP-LCG2 ] Reporting Period: [ 12/11/2005 ] to [ 18/11/2005 ] Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt PX: px01.lip.pt LFC: lfc01.lip.pt Non-Functional Time ==================== [CT] and {JS] on the 18 of November Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ [CT] and {JS] was due to the upgrade of the glite-rgma and re-run of yaim, the gip was not properly configured and the SE mon was misconfigured solved by re-runing the config_gip script
        Speaker: David, Mario (LIP)
      • IFAE 15m
        Weekly Operations Status Report: [ IFAE ] Reporting Period: [ 14/11/05 ] to [ 21/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ifaece02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos (PIC)
      • PIC 15m
        Weekly Operations Status Report: [ PIC ] Reporting Period: [ 14/10/05 ] to [ 21/11/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - fails on our sft tests due to high load on our bdii server. Load on server after reboot remains normal but we still fail tests from time to time - pbs_server problems. Servers hangs several times and works well afert being killed/restarted Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done Points to Raise at the Operations Meeting ========================================= none
        Speaker: Borrego, Carlos (PIC)
      • UAM-LCG2 15m
        Speaker: Pardo Navarro, Juan Jose (UAM)
      • UB-LCG2 15m
        Speaker: Graciani, Ricardo and Casajus, Adrian (UB)
      • UPV-GRyCAP 15m
        * The SFT monitoring reports rgma test failures at UPV on the following dates: 17-11-2005 04:23 18-11-2005 10:02 20-11-2005 22:20 Weekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 14/11/05 ] to [ 18/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> 0 days Non-Functional Time ==================== - Total days unavailable:0 day Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0 * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ Some intermittent errors appeared in the SFT test in the Replica Management tests. The errors are different each time, and it seems not to be a problem in our site. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= none
        Speaker: Caballer, Miguel (tel. +34 963877007 ext 88254) (GRyCAP-ITACA (UPV))
      • USC-LCG2 15m
        Weekly Operations Status Report: [ USC-LCG2 ] Reporting Period: [ 12/10/2005 ] to [ 18/11/2005 ] Availability of Core Services Hosted in the Site ================================================== No Core Service Hosted. Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [ already done ] By when will the WNs in the Site be upgraded? [ already done ] Points to Raise at the Operations Meeting ========================================= None
        Speaker: Saborido, Juan Jose
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      APEL STATUS REPORT == Period == From November 12 to November 18 == Summary == All sites have published accounting data during the week. 2 sites (IFCA and LIP) have some problems Regarding CPU normalization: * CIEMAT and UAM should check their cputmult factors For further deails, please check the results of the SFT normalization tests in: http://mon.egee.cesga.es/sft/lastreport.cgi == Status of each SWE site == Site: BIFI Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CESGA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: CIEMAT Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: CNB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: ifae Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: IFCA Solved Problems of Last Report: Yes Missing Accounting Entries: Since 15/11/05 Publishing User Name Information: Yes Actions: Check apel logs Other Comments: None Site: IFIC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: INTA Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: LIP Solved Problems of Last Report: Yes Missing Accounting Entries: 18/11/05 Publishing User Name Information: None Actions: Check Apel logs Other Comments: None Site: pic Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UAM Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: UB Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None Site: UPV Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes Actions: None Other Comments: None Site: USC Solved Problems of Last Report: Yes Missing Accounting Entries: None Publishing User Name Information: Yes. They have published some old records without this information Actions: None Other Comments: None == Accounting Support == * Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/ * Accounting FAQ: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html * Accounting Statistics: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/ * CPU Normalization: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html * Accounting Guides: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/ * Contact e-mail: egee-admin@cesga.es
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Renewal of the Thematic Network of GRID Middleware at Spanish level 15m VRVS

      VRVS

      As some of you probably know, there is the initiative of renewing the Thematic Network of GRID Middleware at Spanish level. We (IFIC) think that it would be interesting to find a wider interest from the SWE EGEE community so we propose to include the following point in the agenda of the next meeting: * Discussion about the participation in the new Thematic Network of GRID Middleware
      Speaker: Salt, Pepe (IFIC-CSIC)
    • 12:20 → 12:35
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Sites which have deployed the sensor are: CESGA - OK IFAE - OK IFCA - OK IFIC - OK LIP - OK PIC - OK BIFI - OK. With problems. UPV - NOT DEPLOYED go to http://grid-mon.lip.pt/grid-mon/index.php and in case of doubts send mail to Mario. Network graphs show bandwidth evolution over time.
        Speaker: David, Mario (LIP)
      • 5.9.19.1 All sites to upgrade the gridice sensor in all machines 15m
        La lista quedaría así: - Actualizados: BIFI, CESGA, CIEMAT, CNB, IFAE, LIP, PIC, UAM, UB, UPV, IFCA, IFIC, INTA, IFCA and USC. UPV - Still using LCG 2.4. When they will upgrade to LCG 2.6 and they have to reinstall. Installation in worker nodes is optional for security issues.
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.11.7.1 All sites to check and renew their host certificates (CLOSED) 15m
        * Last year some high number of certificates were created in November 11th, 2004 due to a new release of the spanish CA certificate. * Renewing certificates is an normal operational procedure but in this case should be watched and monitored. * No need to issue the command from the same host to be renewed. Just do it in your User Interface where the configuration files are usually up to date. * There is an open ticket for CNB Storage Element with expired certificate. Solved!
        Speaker: Pacheco, Andreu (IFAE-PIC)
      • 5.11.14.1 Search for supporters for TPM, Responsible Units and Users 15m
        * Mario will send a mail to the list. * Mario will try to test the SWE portal and the workflow of tickets between GGUS and the SWE portal.
        Speaker: David, Mario (LIP)
    • 12:25 → 12:40
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (IFAE)
      • PIC Report 15m
        * Carlos reporting. * SFT in green state but RB cannot submit to CE. * All in gLite 1.4 * Problem with the specific VOMS server to use.
        Speaker: Carlos Borrego (PIC)
      • CESGA 15m
        * Javi Lopez reporting. * Last week they were looking at SFT test results. * They were able to submit jobs but SFT tests failed in this action. Maybe VOMS problem.
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro reporting. * SFT seems a mess due to lack of DTEAM support. * Extra mess, DTEAM membership changes with VOMS server. * Trying to install a new CE to give access to the LCG production system.
        Speaker: Fernandez Casani, Alvaro (IFIC)
      • LIP 15m
        * Mario reporting. * Mario and Gonzalo sent last friday the proposal for common configuration. * They are waiting for the latest gLite release for reflecting changes in the configuration files. Nothing should have changed
        Speaker: David, Mario (LIP)
      • INTA-CAB 15m
        * Kai Neuffer. * Still lots of problems with the CE. Investigationg.
        Speaker: Kai Neuffer (INTA-CAB)