EGEE-SA1-SWE Meeting
VRVS Virtual Room (http://www.vrvs.org)
-
-
12:00
→
12:15
Briefing of activities 15m VRVS
VRVS
Speaker: Pacheco, Andreu (IFAE) -
12:05
→
12:15
Operational status from sites 10m VRVS
VRVS
* From February 1st 2005 all sites must report by mail their operational status each friday by filling their form in the site: https://cic.in2p3.fr/index.php?id=rc&subid=rc_report&js_status=22 To edit a RC report there are 4 steps: 1- to choose the region which the RC belongs to 2- If the user is recognized as a RC manager : he will see all RC reports for which he is responsible and will be able to edit or display them. otherwise he will have to registered as RC manager throught a RC or ROC manager in the GOC database. 3- When the user edits a report, he has 30 minutes to edit and validate the report (Some alerts will be displayed to prevent the user from exceeding this time). This constraint is in order to manage the concurrent access between the RC managers . 4- To finish, the user will have to confirm these modifications to commit the data. .Speaker: Merino, Gonzalo (PIC)-
BIFI-LCG 15mWeekly Operations Status Report: BIFI Reporting Period: 21/11/2005 to 25/11/2005 Availability of Core Services Hosted in the Site ================================================== No core services running at BIFI Non-Functional Time ==================== 3 SFTs run by GOC failed along the reporting period: [CT] 2005-11-22 10:05:11 Random failure in the replica management test [CT] 2005-11-22 22:05:01 Random failure in the replica management test [CT] 2005-11-25 10:05:01 Our SE's power supply crashed this friday's morning Scheduled Down Time =================== No scheduled down time during the reporting period neither expected in the coming days. Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (running SL 3.0.4) By when will the WNs in the Site be upgraded? Already done (running SL 3.0.4) Points to Raise at the Operations Meeting ========================================= NoneSpeaker: Losilla Anadon, Guillermo (BIFI)
-
CESGA-EGEE 15mSpeaker: Lopez, Javier (CESGA)
-
CIEMAT-LCG2 15mSpeaker: Calonge, Javier (+34913466000 Ext: 6802) (CIEMAT)
-
CNB-LCG2 15mSpeaker: David Garcia Aristegui (CNB)
-
IFCA-LCG2 15mSpeaker: Cano, Dani (IFCA)
-
IFIC-LCG2 15mSpeaker: Sanchez, Javier (IFIC)
-
INTA-CAB 15mWeekly Operations Status Report: INTA-CAB Reporting Period: 21/11/05 to 25/11/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period 0 days * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ None. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting ========================================= None.Speaker: Neuffer, Kai (INTA)
-
LIP-LCG2 15mwe had an electric power meintance this past week and after it the se01 did not come up causing RM and mon gridice failures, solved after the se come back up we had this weekend an electric power failure and this morning trouble with the network in principle everything is OK now bugs in our federation, there were some this morning which were solved like PIC IFAE and UB UPV seems to have solved I asked for some comments and will close this soon and UAM is failing to publish the SE dynamic info Weekly Operations Status Report: [ LIP-LCG2 ] Reporting Period: [ 19/11/2005 ] to [ 25/11/2005 ] Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt PX: px01.lip.pt LFC: lfc01.lip.pt Non-Functional Time ==================== [CT] on the 20 rm failure, seemed random [CT] on the 22 and 23, SE/MON was down, did not come up after the electric power maintenance Scheduled Down Time =================== 22 November between 18h00-20h00 electric power maintenance Major Operational Issues Encountered During the Reporting Period ================================================================Speaker: David, Mario (LIP)
-
IFAE 15mWeekly Operations Status Report: [ IFAE ] Reporting Period: [ 21/11/05 ] to [ 28/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: ifaece02.ifae.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 days Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ none Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? done By when will the WNs in the Site be upgraded? done Points to Raise at the Operations Meeting ========================================= noneSpeaker: Borrego, Carlos (PIC)
-
PIC 15mWeekly Operations Status Report: [ PIC ] Reporting Period: [ 31/10/05 ] to [ 07/11/05 ] Availability of Core Services Hosted in the Site ================================================== ce01.ifae.es bdii01.pic.es [OK] Non-Functional Time ==================== - Total days unavailable: 0 Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period ================================================================ - sft test failure due a missconfiguration of the lcg-env - sft test failure due to a sporadic network failure between cern and pic Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Done By when will the WNs in the Site be upgraded? Done Points to Raise at the Operations Meeting ========================================= noneSpeaker: Borrego, Carlos (PIC)
-
UAM-LCG2 15mSpeaker: Pardo Navarro, Juan Jose (UAM)
-
UB-LCG2 15mSpeaker: Graciani, Ricardo and Casajus, Adrian (UB)
-
UPV-GRyCAP 15mWeekly Operations Status Report: [ UPV-GRyCAP ] Reporting Period: [ 21/11/05 ] to [ 25/11/05 ] Availability of Core Services Hosted in the Site ================================================== RB, BDII: apis.dsic.upv.es -> 0 days Non-Functional Time ==================== - Total days unavailable: 0.5 day (24/11/2005 Nigth) -> Error en the Replica Management part of SFT tests. Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period - Total days unavailable 0.5 day (10/11/2005 morning - Power supply interruption) * Scheduled Maintenance During the Next Reporting Period - Estimated number of days for which the site will be unavailable 0 days Major Operational Issues Encountered During the Reporting Period ================================================================ Error en the Replica Management part of SFT tests: LRC endpoint not found RMC endpoint not found It seems a problem in the information system. Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? Already done (SL 3.0.4 & FC2) By when will the WNs in the Site be upgraded? Already done (FC2) Points to Raise at the Operations Meeting ========================================= noneSpeaker: Caballer, Miguel (tel. +34 963877007 ext 88254) (GRyCAP-ITACA (UPV))
-
USC-LCG2 15mWeekly Operations Status Report: [ USC-LCG2 ] Reporting Period: [ 19/10/2005 ] to [ 25/11/2005 ] Availability of Core Services Hosted in the Site ================================================== No Core Service Hosted. Non-Functional Time ==================== None Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period None * Scheduled Maintenance During the Next Reporting Period None Major Operational Issues Encountered During the Reporting Period ================================================================ None Upgrade to Scientific Linux 3 (or equivalent) ============================================= By when will all service nodes in the Site be upgraded? [ already done ] By when will the WNs in the Site be upgraded? [ already done ] Points to Raise at the Operations Meeting ========================================= NoneSpeaker: Saborido, Juan Jose
-
-
12:10
→
12:15
APEL Status Report 5m VRVS
VRVS
APEL STATUS REPORT
Period
From November 19 to November 25Summary
During this week, the Flexible Archiver has been down several days (19, 20 and 21). This avoids publishing accounting data properly even if Apel is working fine in some sites.All sites have published accounting data during the week. 1 site (UB) have some problems. Regarding CPU normalization: * CIEMAT and UAM should check their cputmult factors For further deails, please check the results of the SFT normalization tests in: http://mon.egee.cesga.es/sft/lastreport.cgiStatus of each SWE site
Site: BIFI
Solved Problems of Last Report: Yes
Missing Accounting Entries: 20 and 24
Publishing User Name Information: Yes
Actions: Check the Apel logs
Other Comments: Probably they don't have published data due to a R-GMA Server problemSite: CESGA
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes
Actions: None
Other Comments: NoneSite: CIEMAT
Solved Problems of Last Report: Yes
Missing Accounting Entries: 20
Publishing User Name Information: Yes. They have published some old records without this information
Actions: Check the Apel logs
Other Comments: Probably they don't have published data due to a R-GMA Server problemSite: CNB
Solved Problems of Last Report: Yes
Missing Accounting Entries: 20
Publishing User Name Information: Yes. They have published some old records without this information
Actions: Check the Apel logs
Other Comments: Probably they don't have published data due to a R-GMA Server problemSite: ifae
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes. They have published some old records without this information
Actions: None
Other Comments: NoneSite: IFCA
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes
Actions: None
Other Comments: NoneSite: IFIC
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes
Actions: None
Other Comments: NoneSite: INTA
Solved Problems of Last Report: Yes
Missing Accounting Entries: 20
Publishing User Name Information: Yes
Actions: Check the Apel logs
Other Comments: Probably they don't have published data due to a R-GMA Server problemSite: LIP
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: None
Actions: None
Other Comments: NoneSite: pic
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes
Actions: None
Other Comments: NoneSite: UAM
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes
Actions: None
Other Comments: NoneSite: UB
Solved Problems of Last Report: Yes
Missing Accounting Entries: Since 20/11/05
Publishing User Name Information: Yes. They have published some old records without this information
Actions: Check the Apel logs
Other Comments: They have problems with the connection to the accounting database.Site: UPV
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes
Actions: None
Other Comments: NoneSite: USC
Solved Problems of Last Report: Yes
Missing Accounting Entries: None
Publishing User Name Information: Yes. They have published some old records without this information
Actions: None
Other Comments: NoneAccounting Support
* Accounting Web Page: http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/
* Accounting FAQ:
http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/faq.html
* Accounting Statistics:
http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/reports/
* CPU Normalization:
http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/normalization.html
* Accounting Guides:
http://www.egee.cesga.es/EGEE-SA1-SWE/accounting/guides/
* Contact e-mail: egee-admin@cesga.esSpeaker: Rey Mayo, Pablo (CESGA) -
12:15
→
12:30
Action lists 15m VRVS
VRVS
Speaker: Pacheco, Andreu (IFAE)-
5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15mSites which have deployed the sensor are: CESGA - OK IFAE - OK IFCA - OK IFIC - OK LIP - OK PIC - OK BIFI - OK. With problems. UPV - NOT DEPLOYED go to http://grid-mon.lip.pt/grid-mon/index.php and in case of doubts send mail to Mario. Network graphs show bandwidth evolution over time.Speaker: David, Mario (LIP)
-
5.9.19.1 All sites to upgrade the gridice sensor in all machines 15mLa lista quedaría así: - Actualizados: BIFI, CESGA, CIEMAT, CNB, IFAE, LIP, PIC, UAM, UB, UPV, IFCA, IFIC, INTA, IFCA and USC. UPV - Still using LCG 2.4. When they will upgrade to LCG 2.6 and they have to reinstall. Installation in worker nodes is optional for security issues.Speaker: Francisco Jose Bernabe Pellicer (CESGA)
-
5.11.7.1 All sites to check and renew their host certificates (CLOSED) 15m* Last year some high number of certificates were created in November 11th, 2004 due to a new release of the spanish CA certificate. * Renewing certificates is an normal operational procedure but in this case should be watched and monitored. * No need to issue the command from the same host to be renewed. Just do it in your User Interface where the configuration files are usually up to date. * There is an open ticket for CNB Storage Element with expired certificate. Solved!Speaker: Pacheco, Andreu (IFAE-PIC)
-
5.11.14.1 Search for supporters for TPM, Responsible Units and Users 15m* Mario will send a mail to the list. * Mario will try to test the SWE portal and the workflow of tickets between GGUS and the SWE portal.Speaker: David, Mario (LIP)
-
-
12:20
→
12:35
Preproduction Activity Status 15m VRVS
VRVS
This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.Speaker: Pacheco, Andreu (IFAE)-
PIC Report 15m* Carlos Borrego reporting. * Carlos starting the upgrade this morning following Antonio Retico plan. Problems seen...Speaker: Carlos Borrego (PIC)
-
CESGA 15m* Fco. Bernabé reporting. * Tomorrow PPS meeting at 10:00Speaker: Lopez, Javier (CESGA)
-
IFIC 15m* Alvaro Fernandez Casani reporting. * Installing a second CE to interface to the production system. * Starting to use the configuration files from Mario. * Plan to upgrade to 1.4.1 starting this afternoon. Ready by wednesday.Speaker: Fernandez Casani, Alvaro (IFIC)
-
LIP 15m* Mario David reporting. * we are upgrading to 1.4.1,already installed all machines RGMA seems to work properly others have to make further tests to see if they are OK Goncalo was doing this with me, and I was making some kind of tutorial for him we are using the common config.Speaker: David, Mario (LIP)
-
INTA-CAB 15m* Kai reporting. * They started to use the common configuration files. * Usual problems: CE does not execute the job.Speaker: Kai Neuffer (INTA-CAB)
-
-
12:25
→
12:40
A.O.B. 15m VRVS
VRVS
* Course of grid in Zaragoza. 81 people registered.Speaker: All
-