EGEE-SA1-SWE Meeting

→ Europe/Zurich
VRVS Virtual Room (http://www.vrvs.org)

VRVS Virtual Room (http://www.vrvs.org)

Pacheco, Andreu
Description
Present: Andreu Pacheco (IFAE/PIC), Javier Fontan (CESGA), David Garcia Aristegui (CNB), Gonzalo Merino (CIEMAT/PIC), Pablo Rey (CESGA), Celso Martinez Rivero (IFCA), Guillermo Losilla Anadon (BIFI), Javier Sanchez (IFIC), Francisco Bernabe (CESGA), Javier Palacions (IFIC), Daniel Cano (IFCA) Apologies: Kai Neuffer
    • 12:00 → 12:15
      Briefing of activities 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
    • 12:05 → 12:15
      Operational status from sites 10m VRVS

      VRVS

      * From February 1st 2005 all sites must report by mail their operational status each friday by filling their form in the site: https://cic.in2p3.fr/index.php?id=rc&subid=rc_report&js_status=22 To edit a RC report there are 4 steps: 1- to choose the region which the RC belongs to 2- If the user is recognized as a RC manager : he will see all RC reports for which he is responsible and will be able to edit or display them. otherwise he will have to registered as RC manager throught a RC or ROC manager in the GOC database. 3- When the user edits a report, he has 30 minutes to edit and validate the report (Some alerts will be displayed to prevent the user from exceeding this time). This constraint is in order to manage the concurrent access between the RC managers . 4- To finish, the user will have to confirm these modifications to commit the data. .
      Speaker: Merino, Gonzalo (PIC)
      • BIFI-LCG 15m
        * Guillermo Losilla reporting.
        Speaker: Losilla Anadon, Guillermo (BIFI)
      • CESGA-EGEE 15m
        * Javier Fontan reporting. * Recovering from power outage.
        Speaker: Lopez, Javier (CESGA)
      • CIEMAT-LCG2 15m
        Speaker: Calonge, Javier (+34913466000 Ext: 6802) (CIEMAT)
      • CNB-LCG2 15m
        * David Gracia reporting. * Confused with LCG-ROLLOUT discussion on the R-GMA security issue and later released patch.
        Speaker: David Garcia Aristegui (CNB)
      • IFCA-LCG2 15m
        Speaker: Cano, Dani (IFCA)
      • IFIC-LCG2 15m
        Speaker: Sanchez, Javier (IFIC)
      • INTA-CAB 15m
        Weekly Operations Status Report: INTA-CAB Reporting Period:                28/11/05 to 2/12/05 Availability of Core Services Hosted in the Site ================================================ No core services hosted in this site. Non-Functional Time =================== 0 days Scheduled Down Time =================== * Scheduled Maintenance During the Reporting Period       0 days * Scheduled Maintenance During the Next Reporting Period 0 days. Major Operational Issues Encountered During the Reporting Period ================================================================ Problems with sft test lfcrm and rgmasec which will be investigated. The second one seems to be caused by noexistend host certificate. Upgrade to Scientific Linux 3 (or equivalent) ============================================= Already done. Points to Raise at the Operations Meeting  ========================================= None.
        Speaker: Neuffer, Kai (INTA)
      • LIP-LCG2 15m
        * LIP site is failing the sft-rm tests since several days ago Weekly Operations Status Report: [ LIP-LCG2 ] Reporting Period: [ 26/11/2005 ] to [ 02/12/2005 ] Availability of Core Services Hosted in the Site ================================================== RB: rb02.lip.pt PX: px01.lip.pt LFC: lfc01.lip.pt Non-Functional Time ==================== [JS] and [JL] from 26 to 28 of November due to electric power cut at LIP [JL] 29 November due to another electric power cut, we had to disconect part of the machines from the UPS [CT] 29 and 30, RM test failed, the SE didn't come up properly after the power cut and there were nfs stalled conections from the WN's to the SE Scheduled Down Time =================== Major Operational Issues Encountered During the Reporting Period =============================================================== There is work being done at LIP, for the new computing center, and sometimes the total electrical power is not enough when connecting some of the new elements. We hope to have the situation stabilized in a couple of months
        Speaker: David, Mario (LIP)
      • IFAE 15m
        Speaker: Borrego, Carlos (PIC)
      • PIC 15m
        Speaker: Borrego, Carlos (PIC)
      • UAM-LCG2 15m
        Speaker: Pardo Navarro, Juan Jose (UAM)
      • UB-LCG2 15m
        * The UB site is failing the sft-rm tests since several days ago.
        Speaker: Graciani, Ricardo and Casajus, Adrian (UB)
      • UPV-GRyCAP 15m
        Speaker: Caballer, Miguel (tel. +34 963877007 ext 88254) (GRyCAP-ITACA (UPV))
      • USC-LCG2 15m
        Speaker: Saborido, Juan Jose
    • 12:10 → 12:15
      APEL Status Report 5m VRVS

      VRVS

      Due to electrical problems we can not make the Apel status report this week. We try to do it before the next federation meeting.
      Speaker: Rey Mayo, Pablo (CESGA)
    • 12:15 → 12:30
      Action lists 15m VRVS

      VRVS

      Speaker: Pacheco, Andreu (IFAE)
      • 5.3.7.4 Mario to deploy gmdat monitoring tools in SWE (OPEN) 15m
        Sites which have deployed the sensor are: CESGA - OK IFAE - OK IFCA - OK IFIC - OK LIP - OK PIC - OK BIFI - OK. With problems. UPV - NOT DEPLOYED go to http://grid-mon.lip.pt/grid-mon/index.php and in case of doubts send mail to Mario. Network graphs show bandwidth evolution over time.
        Speaker: David, Mario (LIP)
      • 5.9.19.1 All sites to upgrade the gridice sensor in all machines 15m
        La lista quedaría así: - Actualizados: BIFI, CESGA, CIEMAT, CNB, IFAE, LIP, PIC, UAM, UB, UPV, IFCA, IFIC, INTA, IFCA and USC. UPV - Still using LCG 2.4. When they will upgrade to LCG 2.6 and they have to reinstall. Installation in worker nodes is optional for security issues.
        Speaker: Francisco Jose Bernabe Pellicer (CESGA)
      • 5.11.14.1 Search for supporters for TPM, Responsible Units and Users 15m
        * Mario will send a mail to the list. * Mario will try to test the SWE portal and the workflow of tickets between GGUS and the SWE portal.
        Speaker: David, Mario (LIP)
    • 12:20 → 12:35
      Preproduction Activity Status 15m VRVS

      VRVS

      This section will contain an update about the preproduction activity in SWE where more and more sites will be involved.
      Speaker: Pacheco, Andreu (IFAE)
      • PIC Report 15m
        Speaker: Carlos Borrego (PIC)
      • CESGA 15m
        * Fco. Bernabe reporting. * Upgraded CE and WN to 1.4.1
        Speaker: Lopez, Javier (CESGA)
      • IFIC 15m
        * Alvaro Fernandez reported by mail. * PPS-IFIC upgraded to gLite version 1.4.1
        Speaker: Fernandez Casani, Alvaro (IFIC)
      • LIP 15m
        Speaker: David, Mario (LIP)
      • INTA-CAB 15m
        Speaker: Kai Neuffer (INTA-CAB)
    • 12:25 → 12:40
      A.O.B. 15m VRVS

      VRVS

      * Andreu Pacheco reports that a service Service-Challenge 3 issue has been raised. Copying large files with gridftp protocol using various streams lead to severe file fragmentation.
      Speaker: All