Choose timezone
Your profile timezone:
### September 9: concrete door will remain closed
CMS-RPC, CMS-CSC, ATL-MM: 1h each in the morning
### September 16: concrete door will remain closed unless different request (before Friday)
move detector according to presence of beam pipe
Roberto will discuss with Adrian when detector will have to be moved
ATL-MDT will remove the setup from corridor at the first occasion we open the concrete blocks.
EHN1 Buffer Zone Operation: How to move material out of the GIF bunker
https://gif-irrad.web.cern.ch/gif-irrad/ see navigation bar for “EHN1 Buffer Zone Operation”, which indicates all details.
Wed:
Thu:
Fri
Sat
Sun
Mon
Tue
Wed