### September 16: concrete door remain closed unless different request (before Friday)
move detector according to presence of beam pipe (all movement should be completed by 11am)
Today test for:
-readout position of attenuators
-readout position of source
CSC need to access the area and perform test. Sylvain and Antoine will inform before any manipulation of the source.
ALL setups are requested to prepare 1 slide concerning program fro the RD51 weeks.
Roberto will check with RD51 which beam and intensity and prepare 1 slide.
Roberto to check what is P348? two weeks. Do they use muon?
Waiting news from Yan concerning TGC.
MM requested source scan upstream (about 3 hours in the morning). RPC would like to do scan on Friday (more propably on Monday). Michele and Gabriella will check if any overlap is possible.
MM will access the bunker on Sunday. Need to inform CSC (if they are on).
### September 23: concrete door will remain closed unless different request (before Friday)
ATL-MDT will remove the setup from corridor at the first occasion we open the concrete blocks.
EHN1 Buffer Zone Operation: How to move material out of the GIF bunker
https://gif-irrad.web.cern.ch/gif-irrad/ see navigation bar for “EHN1 Buffer Zone Operation”, which indicates all details.
Wed:
Thu:
Fri
Sat
Sun
Mon
Tue
Wed