ALL setups are requested to prepare 1 slide concerning program fro the RD51 weeks.
For the moment, Yan is not available for October 21. Discussion on going with Davide Boscherini (AIDA responsible).
### September 30: concrete door will remain closed unless different request (before Friday)
### October 7: concrete door open
Installation cables for GasSystem R&D (Beatrice)
ATL-MDT will remove the setup from corridor at the first occasion we open the concrete blocks.
EHN1 Buffer Zone Operation: How to move material out of the GIF bunker
https://gif-irrad.web.cern.ch/gif-irrad/ see navigation bar for “EHN1 Buffer Zone Operation”, which indicates all details.