GIF++ installation and schedule meeting
ALL setups are requested to prepare 1 slide concerning program fro the RD51 weeks.
For the moment, Yan is not available for October 21. Discussion on going with Davide Boscherini (AIDA responsible).
Invite Yan/Davide for next GIF meeting (Roberto)
### October 7: concrete door open
Installation cables for GasSystem R&D (Beatrice)
### October 14: concrete door open
Installation cables for CMS-DT (Domenico, Franco Gonnella)
ATL-MDT remove the old setup
ATL-MDT will install a small setup for test with cosmic
ATL-MDT will remove the setup from corridor at the first occasion we open the concrete blocks.
EHN1 Buffer Zone Operation: How to move material out of the GIF bunker
https://gif-irrad.web.cern.ch/gif-irrad/ see navigation bar for “EHN1 Buffer Zone Operation”, which indicates all details.
Wed:
Thu:
Fri
Sat
Sun
Mon
Tue
Wed