GIF++ installation and schedule meeting
ALL setups are requested to prepare 1 slide concerning program fro the RD51 weeks.
For the moment, Yan is not available for October 21. Discussion on going with Davide Boscherini (AIDA responsible).
Not clear who is responsible for the beam trigger. Roberto will investigate and invite the responsible to the next meeting
### October 14: concrete door open
Installation cables for CMS-DT (Domenico, Franco Gonnella)
ATL-MDT remove the old setup
ATL-MDT will install a small setup for test with cosmic
### October 21: concrete door open
Gas sys R&D: complete cable installation
ATL-MDT will remove the setup from corridor at the first occasion we open the concrete blocks.
EHN1 Buffer Zone Operation: How to move material out of the GIF bunker
https://gif-irrad.web.cern.ch/gif-irrad/ see navigation bar for “EHN1 Buffer Zone Operation”, which indicates all details.