Alberto Di Meglio (CERN)
Description
Conference Name: ETICS Technical Committee meeting Recurrence: Every Thursday at 15:30 CET Dial-in numbers: +41227676000 (Main) Access code: 0126137 (Participant) Participant site: https://audioconf.cern.ch/call/0126137
    • 15:30 → 15:35
      Welcome and headcount 5m
    • 15:35 → 16:00
      Status reports 25m
      Highlights of the week, 5 minutes for each WP (NA2, SA1, SA2, JRA1, JRA2)
      • NA2 5m
        NA2 weekly report 14th – 20th November - A-QCM • DNA2.3 – most of the effort this week was spent on the deliverable. It is ready for the internal review. It is going to be submitted to reviewers at the end of the TCOM • Quality experts - Three of the four experts contacted gave their feedback. The feedback was added in the DNA2.3. • Algorythms – working on them. A schema summarizing the algorithms for Grid-QCM will be sent to SA1 by Monday EOB - WEB SITE – Elisabetta’s feedback has been discussed and most of the changes proposed will be integrated into the web site in the following days. Still in the web site activities to do list: § Testimonials link § “Download and Install” page § Software Quality link and tidying up of the A-QCM page (Adriano will work on it ) - DISSEMINATION • Events– ICT2008 will take place next week. Andrea will attend and give a five minutes presentation on the project Andrea is preparing a few slides with high level, catchy information. We hope to have discussions with people also after the conference. • Other activities - worked on a news for the Zero-in e-Magazine of the Belief II project together with SA1. It will be submitted today. - TRAINING – the milestone “two tutorial videos” has been postponed at the moment to after the release of the Client. We should start planning the releases of the other demos included in the “list of topics” document send two weeks ago.
      • SA1 5m
        +++ Client - The version 1.4.0 is being released, the last tests are positive. - Information has been sent to the users to explain the latest delays (i.e. many more tests for the editing functions and a full test suite). +++ Infrastructure - Marian is still away so no major improvements. - Followed the issues about SLC5Gcc 4.3 compiler from the LCG MB discussions to the definition of the possible solutions. Rediscussed it at the MB where Experiments agreed to try the binaries from 4.1.But we should work anyway on a short and long term solution. - Next week when Marian is back we will see whether is possible to provide this as a new temporary Condor platform. +++ Etics Server, Web Interface, Repository - No work on the YUM repository this week - No much progress since last week - YUM repository completed for the build dynamic repository. - Design and Meeting about the dependency/property improvements in the config WA - Wizard framework documentation - Deployment of the disseminator in etics-02 machine art CNAF - Work in Submission (Run) tab is complete. Version contain also the changes proposed after firs SA1 review. Etics Test server has been updated with these changes. +++ Deliverables and Plans - DSA1.3 Deliverable ongoing should be done by next week. Service Level Agreement of the Etics Services. Will distribute it to SA1 first. - Review the plans with tasks from AHM and other tasks, milestones and deliverables.
      • SA2 5m
        Support ------- - Michele, Marco, Andras in shift. 5 tickets in, 4 solved, 1 escalated. 4 requests for externals handled. - User guide ported to the support site. For the moment it is visible only to us. Will send instructions for registering within tomorrow. - Continued working on enabling X.509 authentication for the support site Requirements ------------ - Preparing the list of requirements due next week, VEGA requirements added. New Applications ---------------- - UNICORE porting nearly completed, solved some problems when compiling the code. StoRM nearly completed. No progress on VDT porting. Infrastructure Integration Job Submission ------------------------------------------ - ETICS configurations for the three submission component created. Client for internal testing ready. Started testing the NMI submitter prototype. - Application for ETICS VO ready, need to know the machine where we're building gLite to get the SpecInt2000 rating Evaluation ---------- - Tried automated deployment, will send report tomorrow. - Finishing Will start interviews next week Nov 15th Applied for ETICS VO 5 Nov 15th Feedback on deployment automation to SA1 Nov 30th Interviews Nov 30th List of requirements to SA1 Nov 30th UNICORE, VDT, StoRM integrated Nov 30th Prototype for submitter service with Metronome Nov 30th ETICS VO created
      • JRA1 5m
      • JRA2 5m
        JRA2's report for this week: ---------------------------------------------------------------------- Started planing the integration of the testsystem and workflow designer into Etics. Designed the plugin workflow xml (this is the connection between the workflow designer and the future client side plugin manager). Collected all the new features required to integrate the various parts of the system. We've also defined the various user roles for the portal component. TestSystem portal We still couldn't deploy the TestSystem portal correctly. Logs from Tomcat doesn't contain any valuable information. Hope that next week Marian can help with the deployment and finally we can close this problem.
    • 16:00 → 16:05
      Deliverables reviewers 5m
    • 16:05 → 16:20
      Milestones and planning check 15m
      Formal check of agreed milestones and planning
      more information
    • 16:20 → 16:25
      ETICS USIS (User Satisfaction Improvement Strategy) 5m
      Improving user satisfaction about usage of the ETICS services is critical. ETICS is often perceived as slow and difficult to use. This is due to a number of factors: 1) Need for technical improvements in speed and usability 2) Disinformation or third-party rumours 3) General resistance to adopt 'procedures' We need to understand what to focus on and have a plan to address this issue as a combination of technical enhancements, training and dissemination. Where to start?
    • 16:25 → 16:30
      AOB 5m