ETICS Technical Commitee

→ Europe/Zurich
TBD (CERN)

TBD

CERN

Alberto Di Meglio (CERN)
Description
Conference Name: ETICS Technical Committee meeting Recurrence: Every Thursday at 15:30 CET Dial-in numbers: +41227676000 (Main) Access code: 0126137 (Participant) Participant site: https://audioconf.cern.ch/call/0126137
    • 15:30 → 15:35
      Welcome and headcount 5m
    • 15:35 → 16:00
      Status reports 25m
      Highlights of the week, 5 minutes for each WP (NA2, SA1, SA2, JRA1, JRA2)
      • NA2 5m
        - A-QCM - DNA2.3 – was sent to TC and PMB last week - Algorythms – A first version was sent on Monday to Alberto Aimar as SA1 activity leader - WEB SITE – is kept up to date. Working on the content for the Quality link and the A-QCM links which should be ready by tomorrow. Still in the web site activities to do list: § Testimonials link § "Download and Install" page Please if you have anything which could be interesting for the web site (releases, conferences, meetings etc.) get in touch with Catherine. - DISSEMINATION - Events– Andrea is at ICT2008 he gave the short presentation on ETICS 2 he also had the possibility to approach people interested in ETICS system. He will send a report as soon as he is back. - Other activities – Worked on a short description of ETICS 2 for the EGEE collaborating project page it was submitted through the on-line form. - TRAINING – We should start planning the releases of the other demos included in the "list of topics" document send two weeks ago.
      • SA1 5m
        + CLIENT - ETICS Client 1.4.0 is ready for release, need to create the final configuration, lock and run the testsuite once more on the registered packages + INFRASTRUCTURE - Prepared a new platform: SL5 + gcc 4.3 + python 2.5 instead of gcc 4.1 + python 2.3 Now all external need to be provided for the platform. - Firewall rules personally set-up, for the XSite submission, as were blocking the corss-submission between CERN and UoW. - Re-checking our backup policy in the future (excessive #files) and parameters with AFS. - Repository problem to write in AFS during the weekend under investigation. now parallel copy in place and option disabled in the repository - Receiving feedback for tests of ETICS installation @ VEGA / INFN + NEXT RELEASE - Preparing the next release (2.3.0, after the client) on etics-test - Runs tab: for looking at the results of the runs a project. - Disitribution of YUM packages will be available - Improvements to the current WebApp will be included - Disseminator with the URL query working if it is correct (i.d. at least with one project and one metric). Deployment of disseminator + web portal in a test installation. + MEETING, DELIVERABLE, ETC - 24 Nov: e-concertation meeting in Lyon. Focus was on better communication and fostering grid standards - DSA1.3 Deliverable ongoing and not completed yet. Is the Service Level Agreement of the Etics Services. Will distribute it to SA1 first.
      • SA2 5m
        Support ------- - Andras, Michele in shift. 4 tickets in, 3 solved, 1 escalated. - Registration enabled on the support site. Need to enable ssh for login. - Continued working on enabling X.509 authentication for the support site. New Applications ---------------- - UNICORE porting nearly completed, we'll have the milesonte's components even if not all because currently some UNICORE components don't build due to restructuring. StoRM nearly completed. Infrastructure Integration Job Submission ------------------------------------------ - ETICS configurations for the three submission component created. Client for internal testing ready. Started testing the NMI submitter prototype. - Application for ETICS VO ready, still need to know the machine where we're building gLite to get the SpecInt2000 rating Evaluation ---------- - First set of interviews done, will continue next wee as Marco is at CERN. Nov 15th Applied for ETICS VO Delayed, need one piece of info Nov 30th Interviews Will be delayed 1 week Nov 30th List of requirements to SA1 On track Nov 30th UNICORE, VDT, StoRM integrated On track Nov 30th Prototype for submitter service with Metronome On track Nov 30th ETICS VO created Will be delayed
      • JRA1 5m
        We were delayed in pushing remote job submission to the pre-production pool because of firewall problems that only Marian can fix. He fixed them this week. We should be running now, but Becky has encountered minor problems and hopes to have them resolved shortly. We've been working on Metronome submitting to Condor-G. We've demonstrated to ourselves that it works, but we need to work out a few more details to get back the complete set of results when a build finishes. Becky is working on this now, and we hope to report more next week.
      • JRA2 5m
        A working version of the TestSystem portal has been finally deployed to the CERN test server (http://lxetvm0016.cern.ch/eticsPortal). It's still rough, and far from the production version, but please write any ideas you have about the system. You can send it to my e-mail address (milassin@4dsoft.hu), or to anyone at JRA2 you know.
    • 16:00 → 16:05
      Next All-Hands meeting 5m
      We know where, we need to start thinking about when and what
    • 16:05 → 16:20
      Milestones and planning check 15m
      Formal check of agreed milestones and planning
      more information
    • 16:20 → 16:25
      ETICS USIS (User Satisfaction Improvement Strategy) 5m
      Improving user satisfaction about usage of the ETICS services is critical. ETICS is often perceived as slow and difficult to use. This is due to a number of factors: 1) Need for technical improvements in speed and usability 2) Disinformation or third-party rumours 3) General resistance to adopt 'procedures' We need to understand what to focus on and have a plan to address this issue as a combination of technical enhancements, training and dissemination. Where to start?
    • 16:25 → 16:30
      AOB 5m