ETICS Technical Commitee

→ Europe/Zurich
TBD (CERN)

TBD

CERN

Alberto Di Meglio (CERN)
Description
Conference Name: ETICS Technical Committee meeting Recurrence: Every Thursday at 15:30 CET Dial-in numbers: +41227676000 (Main) Access code: 0126137 (Participant) Participant site: https://audioconf.cern.ch/call/0126137
    • 15:30 → 15:35
      Welcome and headcount 5m
    • 15:35 → 16:00
      Status reports 25m
      Highlights of the week, 5 minutes for each WP (NA2, SA1, SA2, JRA1, JRA2)
      • NA2 5m
        A-QCM - DNA2.3 – waiting for reviewers comments - Web application design has been completed in time with internal deadline WEB SITE - "Software Quality" link contents are ready for upload on the website - The A-QCM part in "The Etics Solution" link has been restructured and is ready for upload on the website DISSEMINATION - Preparing a second version of ETICS 2 poster for Grid Seminar in Krakow and other future events. - Reminder: OGF25 – submission deadline for Sessions 15th December (conference dates: 2-6 March, Catania together with EGEE User Forum).
      • SA1 5m
        INFRASTRUCTURE - New platform preparation of SL5 + gcc v4.3 and Python v2.5 - ETICS installation @ VEGA / INFN - VEGA has operating etics installation. Improving deployment scripts (cleaning, removing deps) - progressing - Work with UoW for XSite submission deployment.Preparation for condor upgrade to v7.1.2 RELEASE 2.2.0 - Client 1.4.0 released last week. Minor bug to be fixed but reception was positive. RELEASE 2.3.0 - Preparing for release 2.3.0 below is what will and will not include - Latest WA (to be shipped with next release) deployed on etics-test - Finished the work to integrate a new "Runs" tab in the portal, new version - Started to work in the integration of nmi-submitter in the webservice with the code and the information provide by M.Carpene - YUM Repository has changed requirements during a meeting with gLite.Global yum repositories for the registered area should be instead per project. The registered build repository should be like the volatile build and contain only the built packages (not the whole repository up to that moment). Probably it won't be in etics_R_2_3_0 since it is going to be deployed on Tue and not enough testing was done. - Build of the disseminator stand-alone with ETICS but will not be ready for 2.3.0
      • SA2 5m
        Support ------- - Michele, Cristina in shift. 5 tickets in, 2 solved, 1 waiting for reply, 2 escalated - Support portal now using https for the username/password login - Initial prototype for X.509 authentication for the support site portal ready New Applications ---------------- - UNICORE porting completed, we will send url to a project build within tomorrow - VDT build procedures send by Alain working, we need to understand the rpm creation - StoRM initial ETICS configuration done, now discussing with developers how to improve their builds procedures to leverage the system Infrastructure Integration Job Submission ------------------------------------------ - Prototype for the nmi-submitter ready. I'll do a release configuration tomorrow. - As Andres has started working on the buildsystem web service side, we need to agree on a development process. I propose we install the submitter service and provide the endpoint to Andres for the first phase testing and debugging. - Application for ETICS VO ready, Marian sent the SpecInt2000 rating for the build worker nodes. I will complete it within tomorrow. Evaluation ---------- - First set of interviews done, need to put the result together. Milestones ---------- - Nov 15th Applied for ETICS VO Got info from Marian today, now able to complete the registration. Foreseen Dec 5th. - Nov 30th ETICS VO created Blocked by applied for ETICS VO. Foreseen Dec 12th. - Nov 30th List of requirements to SA1 Delayed. Foreseen Dec 5. - Nov 30th UNICORE Done, sending evidence within tomorrow. - Nov 30th StoRM Delayed. Foreseen Dec 19th. - Nov 30th VDT Delayed, foreseen Dec 19th. - Nov 30th Prototype for submitter service with Metronome On track Done. sending evidence within tomorrow. - Nov 30th Interviews Delayed. Foreseen Dec 5.
      • JRA1 5m
      • JRA2 5m
        TestSystem portal Continuous development, fixing bugs of user interface. added help menu. working on plugin uploading. Integration experimenting with service interfaces. gathering requests about missing features. started work on new Plugin interface for client side. The current one has many problems (developers has to repeat commands over and over, propertyManager is fully exposed, etc). The new interface will be backward compatible with the old one using a special wrapper class.
    • 16:00 → 16:05
      Next All-Hands meeting 5m
      We know where, we need to start thinking about when and what
    • 16:05 → 16:20
      Milestones and planning check 15m
      Formal check of agreed milestones and planning
      more information
    • 16:20 → 16:25
      ETICS USIS (User Satisfaction Improvement Strategy) 5m
      Improving user satisfaction about usage of the ETICS services is critical. ETICS is often perceived as slow and difficult to use. This is due to a number of factors: 1) Need for technical improvements in speed and usability 2) Disinformation or third-party rumours 3) General resistance to adopt 'procedures' We need to understand what to focus on and have a plan to address this issue as a combination of technical enhancements, training and dissemination. Where to start?
    • 16:25 → 16:30
      AOB 5m