Operational Scenarios within the Complex30mAB Auditorium Meyrin
AB Auditorium Meyrin
CERN
- Versatility of the (present) machine (to be maintained)
- Generation of “exotic” beams (some thoughts on machine activation?)
- Transfer of LHC type (and other) beams to the PS
- Generation of energy modulation
- Beam characteristics to be expected around the PSB injection
(distribution region up to injection point)
- Tunability, uncertainties
Speaker:
Alessandra Lombardi(CERN)
Slides
10:35
→
11:00
Coffee break
25m
AB Auditorium Meyrin
AB Auditorium Meyrin
CERN
11:00
→
11:45
PS Booster beam dynamics with L445mAB Auditorium Meyrin
AB Auditorium Meyrin
CERN
- Longitudinal painting
- Simulation of beams with strong direct space charge forces,
- Limitations due to H- injection hardware,
- Planned studies (investigations on feasibility of collimation)
Speaker:
Christian Carli(CERN)
Slides
11:45
→
12:30
Upgrade of distribution and injection region45mAB Auditorium Meyrin
AB Auditorium Meyrin
CERN
- Layout, apertures magnets of the distributor region
- Layout, apertures, magnets and vacuum aspects of the injection region
- Foil handling mechanism
- Environment seen by the beam (BS inside/outside vacuum, shielding of cavities created ..)
Speaker:
Wim Weterings(CERN)
Slides
12:30
→
14:00
Lunch
1h 30m
DSR restaurant
DSR restaurant
CERN
14:00
→
14:30
Operational aspects and maintenance of the injection region30mAB Auditorium Meyrin
AB Auditorium Meyrin
CERN
- Transverse painting and aperture aspects, impact of injection failures on foil
- Foil exchange procedures (activation, time …)
- Control of injection losses and beam dump
- Specific instrumentation
Speaker:
DrBrennan Goddard(CERN)
Slides
14:30
→
15:15
Commissioning of the PSB with Linac445mAB Auditorium Meyrin
AB Auditorium Meyrin
CERN
- Commissioning strategies
- Milestones
- Possible difficulties and cures (use of instrumentation)
Speaker:
DrKlaus Hanke(CERN)
Slides
15:15
→
15:45
RF aspects and possible limitations30mAB Auditorium Meyrin
AB Auditorium Meyrin
CERN
- Instabilities with higher intensities
- Beam loading problem at present with C04 cavities
- Future low RF level system (communication with Linac4 for chopping)