Indico celebrates its 20th anniversary! Check our blog post for more information!

LIU - Planning & Installation meeting

Europe/Zurich
864/1-C02 - indisponible a partir du 24/04/2017 (CERN)

864/1-C02 - indisponible a partir du 24/04/2017

CERN

50
Show room on map
    • 16:00 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 16:15
      Follow-up on the ECRs 10m
      Speaker: Julie Coupard (CERN)
    • 16:15 16:25
      LIU-PS SR PS-LJ-EC-0001 (EDMS 1551627) PS Ring 2GeV New Injection Septum and Bumper

      Space reservation for the dismantling and removal of the current injection equipment in straight section 42, followed by the installation of the new eddy current septum based injection.

      Conveners: Jan Borburgh (CERN), Michael Hourican (CERN)
    • 16:25 16:45
      LIU-IONS ECR L3-LJ-EC-0001 (EDMS 1555246) Modification of the GTS-LHC Extraction Region in Linac 3 20m
      In order to reduce ion beam losses in the region immediately downstream from the GTS-LHC ion source (Linac3), an installation of a new electrostatic focusing element (an einzel lens) and increase of aperture sizes of the first two beam pipes of the Linac3 ITL beam line section are proposed. These changes also require an installation of a new modified extraction pumping chamber for the GTS-LHC
      Speaker: Ville Aleksi Toivanen (CERN)
    • 16:45 17:00
      LIU-IONS ECR L3-BCFAB-EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade 15m
      The proposed upgrade concerns the two LINAC3 Faraday Cups ITL.MFC02 and ITM.MFC01. The change consists of installing new detectors mounted on the existing actuators and vacuum vessels. The equipment code for the new Faraday Cups is BCFAB.
      Speakers: Federico Roncarolo (CERN), Sergey Sadovich (The Joint Institute for Power and Nuclear Research - SOSNY (BY))
    • 17:00 17:05
      AoB 5m