GIF++ installation and schedule meeting
from last meeting:
GIF bunker closed this Wednesday December 2nd.
-BEAM TRIGGER
-Which sort of trigger do we need? Waiting news from Weizmann and Technion institutes. Yan expected to present a possible solution for the TGC front end electronic
-scintillators will be needed anyway.
-Alternative solutions:
.wire chambers from EN (Federico will report)
-COSMIC TRIGGER
-Short report about installation of cosmic trigger chambers.
-ABSORPTION FACTOR
-absorption factor need to be discussed for each side (upstream and downstream). Setup responsible should prepare their requests for gamma flux (very urgent!). I prepared a section where the setup responsible should be able to upload the slide.
-SOURCE DURING CHRISTMAS
Waiting instruction/possibility from Federico (glimos)
-FLAMMABLE GAS SHUTDOWN FOR XMAS
-David (EN-MEF) agreed to close the flammable gas at GIF on Wednesday December 16
-WATER COOLING
EN-CV has requested to postpone the installation. They are not ready before December 7.
SOURCE STATUS AND RUN COORDINATOR:
.before any change the Run coordinator should be informed (for the moment Armando, 164257)
.email for source status implemented (by Sylvain). If interested, please subscribe to gifpp-status egroup
.Phone for Run coordinator received.
-AIR CONDITIONING
-SPS-physics coordinator informed.
-No more news after my email to EN-MEF (cc ATLAS and CMS-TC and test beam coordinators).