For the 160 MeV beam injection into the Proton Synchrotron Booster (PSB), a new H- charge-exchange injection system will be installed in sector 1L1, as described in ECR: PSB-L-EC-0001.
With reference to document 1495860, sixteen new BSW chicane stripping foil magnets, 4 in each ring, will be installed in 1L1 necessitating the installation of 60 new standard 19¿ racks to house the power converters, auxiliary power infrastructure and the magnet interlocks. The pulse transformers for BSW2, 3, and 4 shall be separated from the power converters and installed at a separate location.