20–24 Jun 2016
Hôtel Mercure Président, Grenoble, France
Europe/Zurich timezone

Initial Factory Test of the L6200 Multi-Beam IOT for ESS

23 Jun 2016, 11:30
30m
Hôtel Mercure Président, Grenoble, France

Hôtel Mercure Président, Grenoble, France

Grenoble, France
Oral presentation IOTs

Speaker

Mark Kirshner (L-3 Communications)

Description

L-3 Communications Electron Devices is developing a 1.2 MW Multi-Beam Inductive Output Tube (MBIOT) for the European Spallation Source. Construction of the MBIOT has been completed, an in-house test facility is operational, and factory testing is in process. In this talk, the MBIOT design and supporting simulation work will be summarized, as will important aspects of the fabrication process and test configuration. MBIOT performance data will also be presented.

Summary

L-3 Communications Electron Devices is developing a 1.2 MW Multi-Beam Inductive Output Tube (MBIOT) for the European Spallation Source. Construction of the MBIOT has been completed, an in-house test facility is operational, and factory testing is in process. In this talk, the MBIOT design and supporting simulation work will be summarized, as will important aspects of the fabrication process and test configuration. MBIOT performance data will also be presented.

Primary author

Mark Kirshner (L-3 Communications)

Co-authors

Mr Andrew Zubyk (L-3 Communications Electron Devices) Ms Ann Sy (L-3 Communications Electron Devices) Dr Brandon Weatherford (L-3 Communications Electron Devices) Mr Holger Schult (L-3 Communications Electron Devices) Mr Ladislav Turek (L-3 Communications Electron Devices) Mr Michael Boyle (L-3 Communications Electron Devices) Dr Richard Kowalczyk (L-3 Communications Electron Devices) Dr Richard True (L-3 Communications Electron Devices)

Presentation materials