Ninth CW and High Average Power RF Workshop

Europe/Zurich
Hôtel Mercure Président, Grenoble, France

Hôtel Mercure Président, Grenoble, France

Grenoble, France
Alireza Nassiri (Argonne National Laboratory - DOE), Doug Horan (Argonne National Laboratory), Jorn Jacob (ESRF)
Description

The next Continuous Wave and High Average RF Power Workshop, CWRF2016, will take place at the Hôtel Mercure Président, Grenoble, France from 21 to 24 June 2016.

This is the ninth in the CWRF workshop series and will be hosted by the European Synchrotron Radiation Facility - ESRF (http://www.esrf.eu/).

The CWRF2016 sessions will start on the morning of Tuesday, 21 June and will conclude at lunch time on Friday, 24 June.  A visit to the ESRF will be organized during the workshop.
Prospective participants should take careful note of the deadlines for registration and reservation of accommodation which are available on the workshop web pages.

We look forward to meeting you in June in Grenoble.


INTERNATIONAL ORGANIZING COMMITTEE (IOC):

Alireza Nassiri - IOC Chair ANL               
Alessandro Fabris - IOC Co-chair ELETTRA
Erk Jensen CERN
Morten Jensen ESS
Francis Perez ALBA - CELLS
James Rose BNL
Shigeki Sasaki SPRING8

 

SCIENTIFIC PROGRAM COMMITTEE (SPC):

Doug Horan - SPC Chair ANL
Daniel Valuch - SPC Co-chair CERN
Kenneth Baptiste LBNL
Jörn Jacob ESRF
Yoon Kang ORNL
Patrick Marchand SOLEIL
Eric Montesinos CERN
Richard Nelson JLAB                 
Wolfgang Tron PSI

 

LOCAL ORGANIZING COMMITTEE (LOC)

Jörn Jacob - Workshop Chair  ESRF                 
Jean-Maurice Mercier ESRF
Sandra Cardot ESRF
Philippa Gaget ESRF
    • 08:30 09:00
      Registration
    • 09:00 10:30
      Welcome: Welcome and status reports
      Convener: Dr Alireza Nassiri (Argonne National Laboratory - DOE)
      • 09:00
        Welcome address by Jörn Jacob and Pantaleo Raimondi 30m
        Speaker: Jorn Jacob (ESRF)
      • 09:30
        Operation Status of the RF Systems in Taiwan Light Source and Taiwan Photon Source 30m

        Two synchrotron light sources are operated in the National Synchrotron Radiation Center (NSRRC), Taiwan: the Taiwan Photon Source (TPS) is newly built with a circumference of 518.6 meters and stored beam energy of 3.0 GeV, whereas the Taiwan Light Source (TLS) is operated over two decades with a circumference of 120 meters and stored beam energy of 1.5 GeV. Both light sources are equipped with high power superconducting radio-frequency (SRF) modules to accelerate the electron beam. The continuous wave 100-kW RF system for electron storage ring of the TLS has great reliability; its mean time between failure (MTBF) has a record of 862.8 hours in 2013 and lately 665.9 hours in 2015. Two 300-kW CW RF systems serves for electron storage ring of the TPS, higher and higher operation power are requested for greater stored beam current and more insertion devices and thus the operation parameters are still optimized from time to time. Moreover, a 60-kW RF system dedicates to the booster ring of the TLS to satisfy the top-up operation of the TLS storage ring, whereas a 100-kW RF system serves for TPS booster ring. An energy-saving operation scheme is successfully realized on the booster RF system of TLS which requests of beam injection of 2 seconds each minute. Herein not only the operation status and activity but also the foreseen challenges of the CW RF systems of both the TLS and TPS are presented.

        Speaker: Ming-Chyuan Lin (National Synchrotron Radiation Research Center)
      • 10:00
        Status of the ALS and APEX RF Systems at LBNL 30m

        I will present the status of the RF systems at the Advanced Light Source (ALS), the progress made in upgrading the Storage Ring RF system and the remaining work to complete the upgrade. Additionally, I will report on the design and early operation of the Advanced Photon Experiment (APeX) RF systems.

        Speaker: Mr Kenneth Baptiste (LBNL)
    • 10:30 11:00
      Coffee 30m
    • 11:00 12:30
      Klystrons
      Convener: Richard Nelson (Thomas Jefferson National Accelerator Facility)
      • 11:00
        LANSCE Klystron Replacement 30m

        The Los Alamos Neutron Science Center (LANSCE) recently completed major upgrades to its RF systems. The focus of the project was to return LANSCE to its historical operating capability and sustain facility operations for the next several decades. The LANSCE accelerator provides pulsed protons and spallation neutrons for defense and civilian applications. This project involved replacing all the existing 201 MHz RF stations, the low level RF controls, selected electronics chassis and all 805 MHz klystrons. The paper will focus on the klystron replacement. LANSCE was historically supported by two types of 1.25 MW peak power klystrons operating at 805 MHz. Designed and delivered in the early 70s, the reliability of the LANSCE klystrons has been amazing. We are still operating some of the klystrons that were purchased over 40 years ago. This paper will discuss how the basis for our new purchases preserved the demonstrated reliability of the existing design. It will share the measured performance and consistency of the 45 new klystrons and present the current experience with these new klystrons.

        Speaker: Dr Daniel Rees (Los Alamos National Laboratory)
      • 11:30
        Overview of the 704 MHz high power amplifiers at ESS including progress and first results 30m

        The talk will give an overview of the ESS RF system, with focus of the medium beta part of the linac. This section will contain 36 superconducting cavities, each foreseen to be supplied by a single klystron, able to provide 1.5 MW peak output power at 704.42 MHz. ESS is currently procuring three medium beta klystron prototypes: The main design features will be presented in the talk, together with results from the first tests.

        Speaker: chiara marrelli (ESS)
      • 12:00
        Recent developments towards very high efficiency klystrons 30m

        Even though the klystron concept is more than 50 years old, recent innovative ideas concerning the bunching mechanism promise a significant increase of electronic efficiency and indicate the possibility to reach 90%. These ideas include "bunch core oscillations", "concregated bunches" and the BAC method (for "bunch - align - collect"). We will present the status of this work including the recent first experimental verification of the principle.

        E. Jensen reporting for the collaboration (I. Syratchev, A. Baikov, I. Guzilov, J. Neilson, A. Jensen, G. Burt, D. Constable, C. Lingwood, A. Mollard, R. Marchesin, Q. Vuillemin, C. Marrelli, R. Kowalczyk, T. Grant)

        Speaker: Erk Jensen (CERN)
    • 12:30 14:00
      Lunch 1h 30m
    • 12:30 14:00
      Poster session: Tuesday PM to Thursday PM

      Posters will be installed on display from the Tuesday lunch time and let on display until Thursday evening.
      The posters will be accessible at all the coffee and lunch breaks during the workshop between Tuesday PM and Thursday PM, giving time for discussions.

      • 12:30
        Remarks on 3 years SSPA Operation at the Superconducting Linac ELBE 5m

        Since January 2012 the superconducting Linac ELBE is in operation with 1.3 GHz Solid State Power Amplifiers (SSPA). One system can deliver up to 20 kW per cavity.
        The presentation revues the experiences gained within 3 years of operation and problems that have been solved.

        Speaker: Hartmut Büttig (Helmholtz Zentrum Dresden Rossendorf)
      • 12:35
        The operation experience of TLS&TPS RF transmitter and the development solid-state amplifier in NSRRC 5m

        At present, two synchrotron radiation facilities -- Taiwan Light Source (TLS) & Taiwan Photon Source (TPS) are in operation simultaneously in NSRRC. Both RF systems of these facilities use superconducting cavities as electron accelerating components in storage ring. The RF power for the cavity and electron beam is provided by klystrons with high voltage (HV) power supplies. For TLS, the klystron is supplied by a crowbar type HV power supply, while in TPS, the klystron is supplied by a PSM crowbar-less HV supply unit. The operation experience in daily operation and commission will be presented. Besides, to satisfy the coming RF requirement in Phase-II beam-line construction in TPS, solid-state amplifier is also developed in NSRRC. The latest progress will also be described here.

        Speaker: Tsung-Chi Yu (National Synchrotron Radiation Research Center)
      • 12:40
        Advanced Low Level RF system for IFMIF and LIPAc particle accelerators 5m

        The International Fusion Materials Irradiation Facility (IFMIF) aims to develop a structural materials database for future nuclear fusion reactors. In order to validate its final accelerators concept and technologies, the IFMIF Linear Prototype Accelerator (LIPAc) is commissioned at Rokkasho (Japan) in the framework of the IFMIF-EVEDA project.
        CIEMAT (Spain) leads the Engineering Design of the IFMIF RF Power System as well as integrates and provides the RF Power System for LIPAc, including the Low-Level Radio Frequency system (LLRF).
        LIPAc is an innovative accelerator (125mA, 9 MeV D+beam, C.W.). Its challenging requirements lead to a high level of uncertainty and thus a flexible and reconfigurable high performance LLRF is required.
        LLRF systems use to be analog or digital-analog, since they use, at least, analog front-ends for intermediate frequency (IF) conversion before or after digitalization. However, the LIPAc LLRF, developed by CIEMAT and SEVEN SOLUTIONS, is an innovative fully digital system. No analog frequency conversion is performed, which increases the measurement bandwidth and simplify the analog front-end design. This LLRF also integrates White Rabbit (WR) protocol for timing synchronization (sub-nanosecond) and Master Oscillator distribution. The first units have been tested with full power LIPAc RF amplifier chains performing better than expected.

        Speakers: Dr MOISES WEBER (CIEMAT), Miguel Méndez (SEVEN SOLUTIONS)
      • 12:45
        RAON RF Systems 5m

         The RAON accelerator planned SC linac in Korea will use solid state
        power amplifiers to provide superconducting cavities with rf power.
        The RAON main accelerator is composed of a normal conducting
        injector and a superconducting linac. SC linac uses 3 types of SC
        cavities which are QWR, HWR and SSR. SSR is composed of two
        families at low and high beta. Each cavity is driven by a SSPA. SSPA
        which is developed by in house is based on the 2 kW module. An
        LLRF systems to control the amplitude and phase of RF fields, which
        was built for normal conducting cavities for mock-up cavities has been
        modified to control a superconducting cavity. RF reference line will be
        planned to test the power distribution systems.

        Speaker: Jae Eun Han (Institute for Basic Science)
      • 12:50
        HPRF 162.5MHz SSPA(5 kW) Power Test using parallel Plate Gysel Combiner 5m

        In rare isotope accelerator facilities, the 162.5MHz high power RF combiner is used to combine many RF power modules.
        Recentry HPRF combiner has developed to combine high power RF source up to 10 kW for Rare Isotope Science Project(RISP)
        162.5 MHz RF power test to the high power combiner has been performed 5 kW before the full power operation

        Speakers: Jae Eun Han (Institute for Basic Science), Oh Ryong Choi (Institute for Basic Science)
      • 12:55
        High Power Gysel Combiner Circuit design of Parallel plate structure 5m

        The Parallel Plate RF Power Combiner consists of 2 copper palate and has a gap between 2 Plate

        Speakers: Jae Eun Han (Institute for Basic Science), Ki taek Son (Institute for Basic Science)
      • 13:00
        Upgrade of the 1.3 GHz Resonant Ring for High Power RF Test of Accelerator Components 5m

        Since 2009 the ELBE center for high power radiation sources is using a 1.3 GHz resonant ring for RF conditioning of power couplers and to test different waveguide components. The poster describes the ring and two new features that are improving the ring significantly. First, a PLL system is used to stabilize the RF-power in the ring which normally drops with increasing temperature because the frequency of the structure shifts. And second, an adjustable test waveguide was designed that allows perfect matching of a pair of RF-couplers with different antenna tip lengths. All measurements are in good agreement with simulations and the ring is now routinely in use for travelling wave measurements of RF components up to 50 kW CW.

        Speaker: Hartmut Büttig (Helmholtz Zentrum Dresden Rossendorf)
      • 13:05
        First experience using a MicroTCA.4-based LLRF-controller driving the SSPA-based high power RF system at ELBE 5m

        The ELBE center for high power radiation sources is operating a superconducting RF accelerator in CW mode. Since 2012 solid state amplifiers are used to drive the accelerating structures at ELBE. New experiments which are in preparation need a better temporal resolution and therefore a higher beam stability. Since 2013 a test series has been performed to evaluate a MicroTCA.4-based digital LLRF (low level RF) system foreseen to replace the analogue controllers. The contribution gives an overview of the setup, reports first performance results and discusses challenges and experience gained during commissioning.

        Speaker: Michael Kuntzsch (Helmholtz-Zentrum Dresden-Rossendorf)
      • 13:10
        RF systems testing solutions for scientific facilities 5m

        Radiofrequency systems of scientific installations are composed of several independent sub-systems, which should be tested both independent and jointly. These tests may become an issue since normally each system is manufactured by a different company, especially at joint international installations where contributions come from different countries.

        This presentation will introduce the different solutions implemented by BTESA to solve some problems such as how to test an independent SSPA module extracted out of a SSPA amplifier (thus without the main SSPA control, circulator, loads and liquid cooling), how to condition a coupler without the main liquid cooling system of the facility, how to test a 200-entries cavity combiner with a single amplifier, how to test the stability of power supplies for superconducting magnets without the magnet load… Details about the test benches and installations with all the control system, probes, diagnosis and self-refrigeration systems will be described in this poster

        Speaker: Mr Francisco Sierra (BTESA)
    • 14:00 15:30
      Solid state amplifiers 1
      Convener: Doug Horan (Argonne National Laboratory)
      • 14:00
        Ten years of operation with the SOLEIL RF systems : experience, upgrades, R&D’s 30m

        In the SOLEIL storage ring, two cryomodules provide to the electron beam an accelerating voltage of 3-4 MV and a power of 575 kW at 352 MHz. Each cryomodule contains a pair of “HOM free” superconducting cavities, cooled with liquid Helium at 4.5 K, which is supplied by a single 350 W cryogenic plant. The RF power is provided by four solid state amplifiers (SSA), each delivering up to 180 kW. In the Booster ring one 5-cell copper cavity, powered with a 35 kW SSA, provides an accelerating voltage of about 1 MV at 352 MHz. We report here about the ten-year operational experience with these systems, their main upgrades and more generally about R&D’s, carried out at SOLEIL in the SSA field.

        Speaker: Patrick Marchand (Synchrotron SOLEIL)
      • 14:30
        The PSI Compact 500MHz 65kW High Power Solid-State Amplifier 30m

        The Paul Scherrer Institut currently operates a klystron amplifier on the booster ring of the Swiss Light Source (SLS). In order to have an optional RF source for the booster cavity, we have been developing a compact 500MHz – 65 kW solid state RF amplifier. An important goal in this development is the optimization of efficiency at any given operating point. With this technique it is possible to maximize the overall efficiency at any given RF output power. Considerable effort has been made in order to obtain extensive measurements from each individual module with the aim of investigating the behavior of such a large number of combined arrays. We will discuss the amplifier design and present the results of measurements.

        Speaker: Marcos Gaspar (Paul Scherrer Institut)
      • 15:00
        LCLS-II High Power RF Systems Overview and Progress 30m

        A second X-ray free electron laser facility, LCLS-II, is being constructed at SLAC. LCLS-II is based on a 1.3 GHz, 4 GeV, continuous-wave (CW) superconducting linear accelerator, to be installed in the first kilometer of the SLAC tunnel. Multiple types of high power RF (HPRF) sources will be used to power different systems. The main 1.3 GHz linac will be powered by 280 1.3 GHz, 3.8 kW solid state amplifier (SSA) sources. The normal conducting buncher in the injector will use four such SSAs. Two 185.7 MHz, 60 kW sources will power the photocathode dual-feed RF gun. A third harmonic linac section, included for linearizing the bunch energy spread before the first bunch compressor, will require sixteen 3.9 GHz sources at about 1 kW CW. A description and an update on all the HPRF sources of LCLS-II and their implementation is the subject of this paper.

        *Work supported by DoE, Contract No. DE-AC02-76SF00515

        corresponding author: anahid@slac.stanford.edu

        Speaker: Anahid Yermeian (SLAC National Accelerator Laboratory)
    • 15:30 16:00
      Coffee 30m
    • 16:00 18:00
      Solid state amplifiers 2
      Convener: Jorn Jacob (ESRF)
      • 16:00
        Solid state amplifier using a cavity combiner 30m

        Further to our communication at last CWRF, a 85kW solid state amplifier has been designed, assembled and tested at ESRF up to 90kW. Its operation frequency is 352.2MHz. It features a cylindrical cavity to combine the RF power coming from its 132 modules. Details will be given on its construction, and test results both for CW and pulse modes.

        Speaker: Mr Michel Langlois (ESRF)
      • 16:30
        High Power Solid State Power Amplifiers for the CERN LHC Injector Upgrade for SPS programme 30m

        The talk will explain the reasons why CERN signed a contract for the procurement of two 2 MW peak power amplifiers based on SSPA technology.

        Comparison that has been made with other technologies (tetrodes, IOT, Diacrodes, Klystrons) will be explained.

        Basic principles of the chosen solution will be given.

        Speaker: Eric Montesinos (CERN)
      • 17:00
        Development of a cavity-type power combiner for 509 MHz solid state amplifier 30m

        Development of a solid state amplifier (SSA) is planned for a 509 MHz accelerator cavity at the SPring-8 storage ring, as an optional plan of the upgrade project. Instead of the present power distribution system using a 1.2 MW klystron, a 100 kW SSA drives each of acceleration cavities. This system enables us to control the power and phase of the cavity, which gives us the redundancy, better stability, and maintainability. In order to obtain a 100 kW rf power, we should combine rf power from 160 LDMOS transistor modules. Therefore a power combiner with low loss is important for better power efficiency and cost reduction. We designed an 80-way power combiner using a TM010 mode cavity with 80 input loop couplers attached on the cylinder inner surface of the cavity. The design simulation shows the power loss of the combiner is less than 2% in the ideal case. We made a prototype combiner and measured its rf characteristics. 4-way power combining with 6% loss, which was consistent with our designed value, was confirmed. In addition, we demonstrated the power combining from 4 LDMOS transistor modules with 10% loss. This presentation reports the design and obtained characteristics of the prototype.

        Speaker: Takahiro Inagaki (RIKEN SPring-8 center)
      • 17:30
        Preliminary measurements of eight solid-state modules of the 10 kW pulsed power amplifier at 352 MHz under development at FREIA 30m

        Solid-state high power amplifiers are increasingly used in particle accelerators as drivers and as high power stages themselves. In this context, at FREIA, we are developing a 10 kW pulsed power amplifier at 352 MHz. The frequency and pulsed operation (3.5 ms pulse at 14 Hz repetition) correspond to the specifications of the European Spallation Source (ESS), which we assist in its development and testing. The 10 kW amplifier is composed of eight modules, each module is built around a single package including two Si LDMOS transistors, operated in class B. The r.f. design implements matching networks in a single-ended architecture and avoids the use of baluns, required for a push-pull configuration. The operation in pulsed mode allows using a capacitor bank (eight 68 mF capacitors) releasing the extent of the DC power supply. Preliminary measurements demonstrate an output pulsed power around 1250 W per module, a power-added efficiency of 70% and a gain of 20 dB. A small variation (< 5⁰) within the phase and gain (< 0.5 dB) distribution among the modules is obtained. Analogue circuits monitoring the operational currents, voltages and temperature for each module are also under development in addition of high power combiners.

        Speaker: Dragos Dancila (Uppsala University)
    • 08:30 10:30
      Status and projects 1
      Convener: James Rose (Brookhaven)
      • 08:30
        Status and Operation of the ALBA RF System 30m

        ALBA is a 3 GeV, 400 mA, 3rd generation Synchrotron Light Source in Barcelona, Spain. The RF System provides up to 3.6 MV of accelerating voltage and restore up to 540 kW of power to the electron beam. For that, six RF plants, working at 500 MHz are in operation. A RF plant includes a Dampy cavity (HOM damped) which is feed by two 80 kW IOT amplifiers combined via CaCo; a cavity combiner. This presentation describes the performance of the RF systems, including reliability statistics during 2015 and 2016. Also, the installation of five L3 4444C IOT’s will be presented, comparing their performance and reliability to the Thales TH-794 IOT’s that are also in use at ALBA.

        Speaker: Jesús Ocampo (CELLS - ALBA)
      • 09:00
        Towards Elettra-II 30m

        Elettra is a user dedicated third generation light source operating at 2.0 GeV ( 310 mA) and 2.4 GeV (160 mA). The performances and the operating features of the 500 MHz storage ring RF stations and the single RF booster plant are presented. The revamp plan of the RF power sources that takes into account the requirement for the Elettra II project is presented. The first step of this plan is the 18 kW SSPA for the Booster.

        Speaker: Cristina Pasotti (Elettra-Sincrotrone Trieste S.C.p.A.)
      • 09:30
        Some Thoughts on the Advanced Photon Source Upgrade (APS-U) 352MHz RF System 30m

        A hybrid seven-bend achromat lattice is designed for the APS-U multi-bend achromat (MBA) which will require a bunch-lengthening cavity to mitigate the effects of Touschek scattering on the beam lifetime. Accommodating MBA lattice in the existing APS storage ring tunnel will require reconfiguration of the present storage ring rf system. We will describe various potential RF system configurations.

        Speaker: Alireza Nassiri (Argonne National Laboratory)
      • 10:00
        RF System Upgrade for the New Extremely Brilliant Light Source at the ESRF, Operation Experience with Klystrons and Solid State Amplifiers 30m

        Since April 2012, the ESRF booster synchrotron is powered with four 150 kW - 352.2 MHz solid state amplifiers (SSA). In 2013 another three 150 kW SSAs were taken into operation on the 6 GeV storage ring, powering new strongly HOM damped cavities, which are run in parallel with the existing five-cell cavities fed from 1.1 MW klystron transmitters. Operation experience and RF system developments partly linked with the recent implementation of top up operation will be reported.

        A new ultra low emittance storage ring is under construction at the ESRF and will be installed in the existing tunnel in 2019. All the five-cell cavities will be replaced with single cell HOM damped cavities. Four of them will be powered with SSAs and ten with an existing klystron transmitter.

        Speaker: Jorn Jacob (ESRF)
    • 10:30 11:00
      Coffee 30m
    • 11:00 12:00
      Status and projects 2
      Convener: Yoon Kang (Oak Ridge National Laboratory)
      • 11:00
        Construction of the RF System for the European XFEL 30m

        The European XFEL is based on a superconducting linear accelerator with an energy of 17.5GeV. The nine-cell superconducting cavities are operated at 1.3GHz at a nominal gradient of 23.6MV/m. In order to supply RF power to the 808 superconducting cavities and to the normal conducting RF gun 27 RF stations are required. Each RF station generates up to 10MW of RF power at a pulse duration up to 1.4ms and a repetition rate of 10Hz. It consists of several subsystems and components e.g. klystrons, modulators or waveguides. A reliable, compact and inexpensive RF power distribution has been developed. During production of the cavities and the accelerating modules for the XFEL it turned out that cavities are only capable of different maximum gradients. Since the original layout was aimed for equal power of 120kW for each cavity it was necessary to modify the distribution allowing for individual RF power supply for each cavity, between 50kW and 240kW. This paper describes the final layout of the RF power distributions and reports on the present status of the construction of the RF system.

        Speaker: Stefan Choroba (DESY)
      • 11:30
        HPRF Systems of Electron Linac at TRIUMF 30m

        A new facility, ARIEL at Triumf is employed 9 cell superconducting cavity at 1300 MHz cw model to produce radioactive isotope beams. The five superconducting cavities are installed in three cryo modules to accelerate electron beams to energy of 500 KW. This paper will present the high power rf system design, tests, commissions and first operation.

        Speaker: Mr Zhengting ANG (TRIUMF)
    • 12:00 13:00
      Quick lunch at hotel 1h
    • 13:00 13:30
      Bus to ESRF 30m
    • 13:30 15:30
      Visit ESRF, group photo 2h
    • 15:30 16:30
      Bus to Vizille 1h
    • 16:30 17:30
      Visit of château, guided museum visit 1h
    • 17:30 18:45
      Vizille park 1h 15m
    • 18:45 19:00
      Bus to banquet 15m
    • 19:00 22:00
      Banquet 3h
    • 08:30 10:30
      Spallation sources
      Convener: Morten Jensen (European Spallation Source)
      • 08:30
        Status and Performance of RF Linac in Oak Ridge Spallation Neutron Source 30m

        emphasized textThe RF linac in SNS has been performing progressively since the commissioning in 2006 for production and delivery of neutrons to beamlines. The RF systems in the front-end, the normal conducting section, and the superconducting section, have been operating as initially designed but with some limitations. Various problems that hampered achieving the design beam power and reduced availability of the SNS accelerator systems have been identified and eliminated through repairs, upgrades, and developments. The 1.4 MW design beam power is now routinely achieved during 24/7 operation while the beam energy is slightly lowered from the design goal of 1 GeV to about 950 MeV. Efforts are put on developments and investigations for system improvements for enhanced availability and performance. In this report, developments, and operation experiences on the accelerator systems will be presented along with the efforts for future upgrades of the SNS accelerator systems.

        Speaker: Yoon Kang (Oak Ridge National Laboratory)
      • 09:00
        Upgrades to the Spallation Neutron Source Radio Frequency Systems to Support the Second Target Station. 30m

        To support the requirements for the Spallation Neutron Source (SNS) Second Target Station (STS), the accelerator systems will be upgraded to support an average proton beam power on target of 2.8MW. To accomplish this requires an increase in both beam energy and average current. We describe the upgrades to the SNS Radio Frequency (RF) systems to support these requirements.

        Speaker: Mark Middendorf (SNS, ORNL)
      • 09:30
        High power model of Isolator 30m

        The European Spallation Source (ESS) will be the world’s most powerful pulsed neutron source by the end of the decade. The ESS linac will accelerate a proton beam current of 62.5 mA to 2 GeV. The beam pulse width is 2.86 ms long and the pulse repetition frequency is 14 Hz, producing a proton beam with 5 MW average power and 125 MW peak power. The acceleration will be provided by 155 cavities. According to the base line design for ESS, there will be one RF system per cavity. Hence there will be 155 RF systems.

        According to energy recovery plans, klystron and IOT collectors as well as anodes of the tetrodes will be cooled by hot water (minimum inlet temperature ≥ 50oC). The loads are also put on high temperature cooling circuit to simplify the energy recovery. To understand the effect of hot water cooling of load on the operation of amplifier, high power model of isolator is developed. The high power model also takes into consideration the effect of finite load return loss and the finite directivity of the circulator.

        The paper discusses the possible effect of load technology and load return loss on the operation of high power amplifiers.

        Speaker: Rutambhara Yogi (ESS)
      • 10:00
        ESS-BILBAO CONTRIBUTION TO THE ESS WARM LINAC HIGH POWER RF SYSTEMS 30m

        ESS Bilbao, an international center for neutron science and technologies in Spain, is in charge of Spanish in-kind contribution to the European Spallation Source (ESS) project. That includes all high power RF sources for the normal-conducting section of ESS LINAC consists of three 30kW solid-state amplifiers for buncher cavities in the MEBT section and six 3MW 352MHz klystron amplifiers for RFQ and DTLs including modulators, LLRF, interlocks and RF distribution system. These RF sources will operate in pulse regime with 3.5ms pulse-width and 5% duty cycle.
        In line with this project, a 2kW solid-state amplifier module based on novel compact balanced architecture has been developed and tested in-house as an R&D activity and also characterization and tendering of 30kW solid-state RF transmitters with high reliability to feed the buncher cavities and high average power klystrons are in process.
        This paper will address status of the project including conceptual design, test results, ongoing activities and challenges.

        Speaker: Arash Kaftoosian (ESS Bilbao)
    • 10:30 11:00
      Coffee 30m
    • 11:00 12:30
      IOTs
      Convener: Alessandro Fabris
      • 11:00
        The Multi-Beam IOT developments for ESS 30m

        The high beta section of the ESS linac requires 84 RF sources which each have to deliver 1.1 MW to the beam plus a power overhead capability for losses and regulation requirements. This talk will summarise the main reasons for funding the IOT developments for this part of the linac, present the outline IOT design and simulation results. Additionally, a selection of key results from the first prototype will be presented.

        Speaker: Morten Jensen (European Spallation Source)
      • 11:30
        Initial Factory Test of the L6200 Multi-Beam IOT for ESS 30m

        L-3 Communications Electron Devices is developing a 1.2 MW Multi-Beam Inductive Output Tube (MBIOT) for the European Spallation Source. Construction of the MBIOT has been completed, an in-house test facility is operational, and factory testing is in process. In this talk, the MBIOT design and supporting simulation work will be summarized, as will important aspects of the fabrication process and test configuration. MBIOT performance data will also be presented.

        Speaker: Mark Kirshner (L-3 Communications)
      • 12:00
        Improvements to Diamond Light Source RF Amplifiers 30m

        Reliability of Diamond Light Source has improved enormously since operation for users began in 2007, with overall machine MTBF for the 12 months to May 2016 over 120 hours. Details are presented of reliability-related management and improvements to both storage ring and booster amplifiers. Beam quality is also an issue for users and so work has been carried out to minimise and remove high frequency noise on the beam arising from the IOT high voltage power supply. Plans to introduce normal conducting cavities into the storage ring to support superconducting cavity operation also introduce challenges and opportunities for amplifier operation and so an overview of amplifier work in relation to this project is discussed.

        Speaker: Peter Marten (Diamond Light Source)
    • 12:30 14:00
      Lunch 1h 30m
    • 14:00 15:30
      Miscellanea
      Convener: Shigeki Sasaki (SPring-8/JASRI)
      • 14:00
        Observation of Failure Modes of RF Amplifiers at ATLAS 30m

        Corresponding author:Y. Luo, yluo@anl.gov

        Speaker: Yong Luo
      • 14:30
        The High Power RF Systems of MAMI and MESA 30m

        The Institute for Nuclear Physics (KPH) of Mainz University is operating the CW mictrotron cascade MAMI (Mainzer Mikrotron) for more than 30 years. Since 2012 KPH is also planning a CW multi-turn energy recovery linac MESA (Mainz Energy-recovering Superconducting Accelerator).

        In this contribution we will sum up our experience with the klystron based RF-system of MAMI (2.45 GHz and 4.9 GHz) and will also discuss our plannings for the solid-state based RF-system of MESA.

        Speaker: Robert Heine (Johannes Gutenberg-Universität Mainz)
      • 15:00
        Circulator Tracking at 80.5 MHz 30m

        A high power amplifier at 80.5 MHz was developed for a linear accelerator system. This amplifier has to hold 100% reflection at all phases and therefore a circulator has to be integrated to protect the transistor of the amplifier pallet from overvoltage breakdown.
        At this low frequency isolation and reflections are changing with RF power and temperature. To hold the necessary input return loss of the circulator, voltage controlled tuning coils give the ability to adjust the magnetic field and tune the circulator in such way that is keeps minimum reflection.
        Software defined tracking algorithm was developed to control the circulator. Input parameters of the tracking algorithm are forward and reflected RF power applied to the input port of the circulator and heat sink temperature. Output of the control module is an analog voltage that keeps circulator return loss at input port at minimum and therefore isolation at maximum.
        Three circulators are part of one 2 kW Solid-State Power Amplifier unit and are controlled simultaneously. Software controlled circulator tracking works for any reflection phase, CW or modulated signal and requires no ramp up or inhibition time to reach full power.
        Circulator characterization, tracking algorithm and implementation results will be presented.

        Speaker: Mr Janez Klanjsek (HBH Microwave GmbH)
    • 15:30 16:00
      Coffee 30m
    • 16:00 18:00
      Solid state amplifiers 3
      Convener: Patrick Marchand (Synchrotron SOLEIL)
      • 16:00
        Solid State RF Amplifier Development at the Advanced Photon Source 30m

        Solid state rf amplifier development is underway at the Advanced Photon Source at two operating frequencies. A new 9.77-MHz solid state driver amplifier was designed and built to replace existing obsolete driver amplifiers presently used in the Advanced Photon Source accumulator ring rf systems. The amplifier design uses a single 1.25kW LDMOS push-pull transistor output device operating at 30 volts. It achieved very high efficiency, which provided the option of forced-air cooling. “Cut and try” techniques were used in the design phase of the amplifier due to the lack of accurate device models at low frequencies. The design and construction of a compact 352-MHz, 12kW cw solid state demonstration amplifier system is also underway. The system consists of six 2kW power amplifier modules supplying rf power to a resonant combining rf cavity. The 2kW amplifier design utilizes a single push-pull LDMOS output device operating at 60 volts, and an efficient cooling system is used to maintain safe transistor die temperature while operating at power levels exceeding normal device specifications. The combining rf cavity consists of a compact rf structure utilizing water cooling, a single resonance-control tuner, six input ports, and one WR2300 waveguide output port. The design process, performance data, and implementation of the new amplifiers will be discussed.

        Speaker: Mr Douglas Horan (Argonne National Laboratory)
      • 16:30
        Time domain characterization of high power RF pulsed solid state amplifiers for linear accelerators 30m

        At the FREIA laboratory, we develop and test high power RF equipment for the linear accelerator of the European Spallation Source (ESS). In this respect, we develop high power RF amplifiers based on the Laterally Diffused Metal Oxide (LDMOS) semiconductor technology. The purpose of this paper is to present a time domain characterization methodology for high-power pulsed amplifiers. A measurement setup composed of an embedded monitoring circuit is built-up in order to perform the pulse profile measurements, as well as to investigate the pulse-to-pulse amplitude and phase stability. The monitoring circuit consists of several analogue sensors and an Arduino microcontroller. The analogue circuits are used to measure the critical parameters of the amplifiers such as: the pulsed current, drain voltage, and operating temperature of the transistor. The measured results enable the evaluation of the amplifiers’ performance and stability i.e. the time domain average and variation of the amplitude and phase. Initial tests performed at about 1.25 kW RF power, with 70% drain efficiency at 352 MHz demonstrate a high stability of the tested amplifiers. A standard deviation of around -85 dB in amplitude and -30 dB in phase is obtained after 10 hours of operation.

        Speaker: Long Hoang (Uppsala University)
      • 17:00
        Innovative High Power, High Efficient Amplifier Design for Accelerator-Applications 30m

        Amplifiers for Broadcast applications with RF output power in the range of 100kW was a domain of tube (IOT) amplifiers.
        Since innovative and powerful LDMOS transistors are available, IOT amplifiers are being replaced by solid state.
        Efficiency and size of modern LDMOS-amplifiers are very competitive and not worse than tube based amplifiers anymore.
        The big advantage to use LDMOS technology is the overall handling: low supply voltages, redundant RF power, high efficiency, serviceability, MTTR, etc.
        All advantages “out of the broadcast world”, i.e. high efficiency and broadband design, high redundancy, hot pluggable amplifier design, high availability
        and serviceability during operation can be applied to the design and requirements of broad- and narrowband amplifiers for accelerator applications.

        This presentation shows how the technologies and design principles used in field proven and reliable broadcast transmitters, which are produced in high volumes
        and designed for 24/7 operation, can be adapted to fulfill the requirements of amplifiers for accelerator applications.

        Speaker: Mr Uwe Dalisda (Rohde & Schwarz GmbH & Co. KG)
      • 17:30
        Commissioning of high-power RF at Solaris Light Source 30m

        This presentation will give a view on an installation, a commissioning process and first operational experience related to injector’s acceleration components and cavities in storage ring with their RF power sources and transmission lines at Solaris synchrotron. Solaris injector’s RF stations uses one K1-type solid state pulsed modulator with S-band 10MW Thales klystron for RF thermionic gun and 3 pieces of K2-type solid state pulsed modulators with S-band 37MW Toshiba klystrons. Modulators are operational since November of 2014, first as standalone RF units for test themselves and now in connection with linear accelerator. Injector consists S-band thermionic RF gun, 6 pieces of room temperature S-band accelerating structures organized in 3 units. 3 SLED cavities are working in one unit. Storage ring includes 2 pieces of 100MHz active main cavities and 2 pieces of 3rd order passive cavities. 2 pieces of solid state 100MHz 60kW transmitters are used for operation in storage ring since May 2015. They are modified CW Band II broadcasting transmitters. Two 30kW racks are combined in one 60kW system and modification in internal control system have been implemented light source application.

        Speaker: Pawel Borowiec (Jagiellonian University (PL))
    • 08:30 10:30
      Tetrodes and miscellanea
      Convener: Eric Montesinos (CERN)
      • 08:30
        Various RF systems within the Collider-Accelerator complex at Brookhaven National Laboratory 30m

        Various High power RF cavities are utilized within the C-AD complex, including ferrite loaded, pillbox, folded transmission line, and tapped transmission line. High power amplifiers range from solid state solutions to vacuum electron devices, at power ranges of 1 kW to 5 MW pulsed. The RF frequency spectrum of systems varies drastically, from 300 kHz to 201 MHz for operational systems, and up to 2.1GHz for developmental systems.

        Speaker: Darryl Goldberg (Brookhaven National Laboratory)
      • 09:00
        Status of the High Intensity Cyclotron RF-System at PSI 30m

        In the High Intensity Proton Accelerator (HIPA) facility at PSI, protons are accelerated in the injector cyclotron to 72MeV and afterwards in the Ring cyclotron to 590 MeV. The routine operation of the facility is at a current of 2.2 mA with tests regularly up to 2.4 mA. In both separated sector cyclotrons, the main acceleration is done by 50 MHz cavities. For flat-topping, an additional 3rd harmonic cavity is installed.

        This talk will report on the operational experience of the rf-system with an emphasis on the amplifiers. Those are 20 to 30 years old tetrode based amplifier chains and feed up to 600kW CW into each main cavity.

        Speaker: Markus Schneider (Paul Scherrer Institut)
      • 09:30
        Optimisation of SLED Cavities and Waveguide Network to Drive the Linac at the Australian Synchrotron 30m

        With the ageing of equipment in user facilities, the risk of downtime due to hardware malfunctions becomes a more likely scenario. At the Australian Synchrotron, two klystrons running at 15 MW each are required for injection into the booster ring. Consequently, failure of a single klystron could lead to the loss of weeks of beam time. A forthcoming upgrade to the current system includes a SLED system for pulse compression to increase output power, and allows for the use of a single klystron for full energy injection from the linac. This paper describes the optimisation of the SLED cavities and waveguide system to deliver electrons at nominal energies in single bunch mode. Following is an analysis on maximising the possible bunch train length multi-bunch mode and a brief look at the feasibility of generating electrons at greater energies.

        Speaker: Thomas Geoffrey Lucas (Australian Synchrotron (AU))
      • 10:00
        INNOVATIVE KLYSTRON MODULATION ANODE VOLTAGE CONTROL SYSTEM AND VOLTAGE & CURRENT MEASUREMENT SYSTEM 30m

        The counter-rotating proton beams in the Large Hadron Collider (LHC) are captured and then accelerated to their final energies by two identical 400 MHz RF systems. The RF power source required for each beam comprises eight 300 kW klystrons powered by two 100 kV, 40 Amp, AC/DC power converters. The klystron currents (and DC power) can be individually controlled by means of a klystron modulator. A solid state crowbar system protects the four klystrons of each unit. The performance of the high-voltage elements of this system are discussed, with emphasis on the new features of the klystron modulator system: the new Voltage and Current Measurement System, which uses sensitive electronics such as current transducers, Complex Programmable Logic Device (CPLD) and Analog-to-Digital Converter (ADC), that have to cope with huge current spikes in case of faults, is described. Ongoing developments for an innovative Klystron Mod Anode Voltage Control System, which will be used to regulate the klystron current, replacing the existing tetrodes, are also discussed.

        Speaker: Ruben Lorenzo Ortega (CERN)
    • 10:30 11:00
      Coffee 30m
    • 11:00 12:30
      Operation reports & Closure
      Convener: Daniel Valuch (CERN)
      • 11:00
        Operation of Diamond Light Source RF Cavities 30m

        In past two years, we have experienced two serious failures of our SRF cavities. Cavity 2 developed a leak from the helium can into cavity UHV and the RF window assembly of cavity 4 failed after just 10 months’ operation. The UHV leak repair is on-going but the RF window was swapped with a spare in a clean room on site and cavity 4 has been subsequently tested to over 2 MV. The impact of cavity failure on machine operation and the long repair time of the UHV leak has led to the proposal for a combined configuration of normal conducting cavities and SRF cavities for the storage ring. We are also working to upgrade our LLRF system from analogue to digital. This will enable us to address issues such as probe blips, cavity conditioning and fault diagnosis. This system will be deployed for both storage ring and booster cavities.

        Speaker: Pengda Gu
      • 11:30
        Availability of PETRA III from the RF point of view 30m

        PETRA has not the availability as expected and stated to the MAC in November 2015.
        It is, with 95 %, not “state of the art” for 3rd generation synchrotrons.
        That is why a ”PETRA III Availability Review” takes place in May 26-27, 2016.
        We want to present the result of this review from the rf point of view.

        Speaker: Ruediger Onken (DESY)
      • 12:00
        Workshop summary and closing remarks 30m

        Workshop summary and closing remarks

        Speaker: Daniel Valuch
    • 12:30 14:00