20–24 Jun 2016
Hôtel Mercure Président, Grenoble, France
Europe/Zurich timezone

Session

Operation reports & Closure

24 Jun 2016, 11:00
Hôtel Mercure Président, Grenoble, France

Hôtel Mercure Président, Grenoble, France

Grenoble, France

Conveners

Operation reports & Closure

  • Daniel Valuch (CERN)

Presentation materials

There are no materials yet.

  1. Pengda Gu
    24/06/2016, 11:00
    Oral presentation

    In past two years, we have experienced two serious failures of our SRF cavities. Cavity 2 developed a leak from the helium can into cavity UHV and the RF window assembly of cavity 4 failed after just 10 months’ operation. The UHV leak repair is on-going but the RF window was swapped with a spare in a clean room on site and cavity 4 has been subsequently tested to over 2 MV. The impact of...

    Go to contribution page
  2. Ruediger Onken (DESY)
    24/06/2016, 11:30
    Oral presentation

    PETRA has not the availability as expected and stated to the MAC in November 2015.
    It is, with 95 %, not “state of the art” for 3rd generation synchrotrons.
    That is why a ”PETRA III Availability Review” takes place in May 26-27, 2016.
    We want to present the result of this review from the rf point of view.

    Go to contribution page
  3. Daniel Valuch
    24/06/2016, 12:00
    Oral presentation

    Workshop summary and closing remarks

    Go to contribution page
  4. Dr Cristiano Morri (OCEM Energy Technology), Dr Giuseppe Taddia (OCEM Energy Technology)
    Oral presentation

    A sophisticated power supply was developed, built and commissioned to operate the RF system of the Collector Ring, a storage ring of the future FAIR (Facility for Antiproton and Ion Research) complex. It supplies the power amplifier of RF: a total of 5 power supplies (anode, control grid, two screen grids, two filaments) and a controlled load.

    The RF system will be operated in continuous...

    Go to contribution page
Building timetable...