BI/TB on LIU-SPS specfications, BLM detector checks, OAF, LHC status and FCC

→ Europe/Zurich
866 2-D05 (CERN)

866 2-D05

CERN

1) LIU-SPS specifications:

A) Missing action points for BSRT and BGI

B) Separate document for ion requirements.

2) Injector BLM detector checks:

A) Question whether simple homodyne principle would not solve the problem

3) OAF:

A) Coming presentations will cover status and plans for framework and instruments reports

4) LHC status:

Issues pending resolution:

A) BPM firmware for post-mortem (being tested today)

B) BWS acquisition with intensity limits as function of beam energy

C) BCT DC acquisition blocked during 24 hours - what about the SMP link?

Safe beam expected by tomorrow (Friday

5) FCC:

- Meetings will be launched by Hermann during 2016 to

A) identify where R&D efforts are required (with milestones)

B) Come up with a draft cost estimate based on today's figures