LN4 LEM (T. Hofmann, G. Boorman):
- Design for 160 MeV with 2 stations (end of L4, transfer-line)
- Installation only during May 2017 (debuncher cavity planning)
- Electron multiplier (as for BSM) for beam size profile
- Less sensitive to stray protons (not case for diamonds)
- ADC covering 4 * 28 channels @50 MS/sec
- PXI based system appears best suited and EN/STI agrees to develop and maintain
- BE/BI to formalise the agreement with EN/STI (Rhodri/L. Jensen)
- T. Hofmann and G. Boorman to write specifications for front-end and expert software
- F. Roncarolo to decide whether BI/PM person (Felix?) should follow FPGA developments
PS/SPS BGI (J Storey):
- Magnet - 2 pole causes too much orbit deformation -> triplet proposed
- PS tank:
- Technical issues with glue and soldering of timePix may limit performance
- Chip heating means external cooling circuits required
- Low out-gassing epoxy glue proposed
- Seems on track for installation during TS on 8th of June 2016
- Slow control PLC being programmed
- Worrying resonance with wire-bonds (CDF/ATLAS) -> to be checked (James)
- SPS systems:
- Radiation concerns believed to be understood and resolved
- Re-commissioning to start during June
LHC Status (Enrico):
- Commissioning over - now to intensity ramp-up and luminosity production
- SPS beam dump limits beam to 72 bunches per cycle/injection
- LHC Sequencer to check status of moveable devices before hign intensity injection (Enrico)
- Request for additional checks to be done in BSRL (LDM) server
- Question about LIFETIME logging (L. Jensen) - how to reduce spikes (Stephane Bart)
- Responsibility for water cooled racks to be clarified (Rhodri)
- Reference documentation for VdM scans needed (Enrico)
- Planning meeting for TS #1 to be organised 27.05 (Enrico)
- Use of BI sharepoint logbook imposed for changes to operational systems
OAF (JJ Gras):
- Nice list of improvements shown
- Next steps?