10–14 Oct 2016
San Francisco Marriott Marquis
America/Los_Angeles timezone

Reconstruction and calibration of MRPC endcap TOF of BESIII

13 Oct 2016, 15:30
1h 15m
San Francisco Marriott Marquis

San Francisco Marriott Marquis

Poster Track 2: Offline Computing Posters B / Break

Speaker

Dr Shengsen Sun (Institute of High Energy Physics, Chinese Academy of Sciences)

Description

The endcap time of flight(TOF) detector of the BESIII experiment at the BEPCII was upgraded based on multigap resistive plate chamber technology. During 2015-2016 data taking the TOF system has achieved a total time resolution of 65ps for electrons in Bhabha events. Details of reconstruction and calibration procedures, detector alignment and performance with data will be described.

Primary Keyword (Mandatory) Reconstruction
Secondary Keyword (Optional) Data processing workflows and frameworks/pipelines
Tertiary Keyword (Optional) Algorithms

Primary author

Dr Shengsen Sun (Institute of High Energy Physics, Chinese Academy of Sciences)

Presentation materials