Description
• Packaging estimate.
• Handling equipment.
• Access needed and plans.
• Cabling inside cryostat.
• Cabling during integrated test.
• Plans to store extra cables from CE boxes before the APA is installed.
• Cable routing for integrated test.
• Translation and transfer tooling.
• Protection for the wire plans.
• Clean room space and access.
• Test equipment.
• Scaffolding/scissor lift/other tools for populating the APA with CE / PD / cabling in the clean room
• Location of 2 APA / 3 APAs inside the clean room.
• Location of platform for beam commissioning / beam instrumentation.
• Method of cabling the feed thru flanges during installation.