Description
• Packaging estimate.
• Handling equipment (including transport from SAS to working position).
• Method of assembly. Will we hang and assemble vertically or assemble horizontal and lift the column onto the rail?
• Electrical connections. Access required inside cryostat. Equipment required in the clean room to test connections.
• Any temporary structure or support necessary and the removal.
• Access needed and plans.
• Component weights and size
• Need for measurement of electrical connections after installation inside cryostat?