Description
• Packaging estimate.
• Handling equipment.
• Subassembly required.
• Electrical connections. In clean room and inside the cryostat?
• Temporary structure and removal.
• Access needed and plans.
• Translation inside cryostat and from install rails (1.5 and 2.5) to support rails (1, 2 and 3).