Workshop Charge:
1. Down-select a crab-cavity design from the proposed concepts and advance the cryomodule design
2. Review the beam simulation results and operational procedures for prototype tests
3. Establish a strategy for a full crab crossing scheme for the phase-II upgrade of the LHC
Choose timezone
Your profile timezone: