Session

Setting The Scene

16 Sept 2009, 08:30
160/1-009 (CERN)

160/1-009

CERN

48
Show room on map

Presentation materials

There are no materials yet.

  1. 16/09/2009, 08:30
  2. Dr Frank Zimmermann (AB/ABP)
    16/09/2009, 08:40
    Phase 2 and phase 1 as technical step, historical evolution, high luminosity with reduced risk, leveling as a key ingredient , issues addressed in the next sessions (global vs local)
    Go to contribution page
  3. Marzio Nessi (CERN)
    16/09/2009, 09:00
    Experiment upgrade plan, cost, leveling, preferences, material from 2008 workshop
    Go to contribution page
  4. Yoshihiro Funakoshi (KEK)
    16/09/2009, 09:20
    Experience, and progress, impedance, transparency, operation, tuning, availability with and w/o crab cavities, ramping of crab cavities with beam present, phase scans, detuning & retuning, what happens in case of a crab rf trip?, diagnostics
    Go to contribution page
  5. Oliver Bruning (CERN)
    16/09/2009, 09:40
    Validation, e.g. what do we need to prove prior to installation (outside) and during phase 1 (in situ)? Demonstration requirements?
    Go to contribution page
  6. 16/09/2009, 10:00
Building timetable...