-
16/09/2009, 08:30
-
Dr Frank Zimmermann (AB/ABP)16/09/2009, 08:40Phase 2 and phase 1 as technical step, historical evolution, high luminosity with reduced risk, leveling as a key ingredient , issues addressed in the next sessions (global vs local)Go to contribution page
-
Marzio Nessi (CERN)16/09/2009, 09:00Experiment upgrade plan, cost, leveling, preferences, material from 2008 workshopGo to contribution page
-
Yoshihiro Funakoshi (KEK)16/09/2009, 09:20Experience, and progress, impedance, transparency, operation, tuning, availability with and w/o crab cavities, ramping of crab cavities with beam present, phase scans, detuning & retuning, what happens in case of a crab rf trip?, diagnosticsGo to contribution page
-
Oliver Bruning (CERN)16/09/2009, 09:40Validation, e.g. what do we need to prove prior to installation (outside) and during phase 1 (in situ)? Demonstration requirements?Go to contribution page
-
16/09/2009, 10:00
Choose timezone
Your profile timezone: