16–18 Sept 2009
CERN
Europe/Zurich timezone

Session

Cryomodule Construction

17 Sept 2009, 10:35
160/1-009 (CERN)

160/1-009

CERN

48
Show room on map

Presentation materials

There are no materials yet.

  1. Ilan Ben-Zvi (Brookhaven National Laboratory), Michael Cole (Advanced Energy Systems)
    17/09/2009, 10:35
    Cavity SBIR and time line, engineering design, tooling, procurement, fabrication, e-beam welding, tuning, coupler ports, interfaces, Helium vessel, cavity treatment and testing options, impact based on down selection
    Go to contribution page
  2. Kota Nakanishi (KEK)
    17/09/2009, 10:55
    Buffer chemical polishing and electro-polishing options, baking and high pressure rinsing, clean rooms, vertical test facility for 800 MHz crab cavities, high power RF, instrumentation and high gradient performance
    Go to contribution page
  3. Pierre Maesen (CERN)
    17/09/2009, 11:15
    Cryomodule assembly options at CERN, test stand for low power and high power testing, high power RF availability, cryogenics, gradient performance in horizontal cryostat, mechanical and transport issues
    Go to contribution page
  4. 17/09/2009, 11:35
Building timetable...