Olivier Brunner
(CERN)
17/09/2009, 08:30
Potential location for crabs in IR4 region, space constraints (longitudinal & transverse) for beam I and beam II, potential locations for cryogenic interfaces, power stations, transmission lines
Joachim Tuckmantel
(CERN)
17/09/2009, 08:45
Cryomodule interfaces, transport, tunnel installation, alignment, high voltage and RF power RF stations, RF valves and vacuum pumps, sensors and monitoring, reference signals, controls and feedback, cooling and ventilation, radiation issues and shielding, hardware safety
Bruno Vullierme
(CERN)
17/09/2009, 09:05
Operating temperature options, extension of main RF vs. crab specific cryogenic lines, Helium pressure, cryo circuits and controls, safety valves and protection, overall installation effort and time line, heat loads, impact on the LHC during prototype tests and regular operation
Mariusz Grecki
(DESY)
17/09/2009, 09:25
General noise sources, amplitude and phase stability, tolerances, options for LLRF control, limitations, state of the art, crab specific signals/controls, integration with LHC main RF, testing, software
Yoshihiro Funakoshi
(KEK)
17/09/2009, 09:45
Streak camera and crossing angle measurements, crab cavity amplitude and phase control using closed orbit distortion, orbit offsets at IP and luminosity measurements, orbit control and feedback near crab cavities and other instrumentation used for crab operation