-
Olivier Brunner (CERN)17/09/2009, 08:30Potential location for crabs in IR4 region, space constraints (longitudinal & transverse) for beam I and beam II, potential locations for cryogenic interfaces, power stations, transmission linesGo to contribution page
-
Joachim Tuckmantel (CERN)17/09/2009, 08:45Cryomodule interfaces, transport, tunnel installation, alignment, high voltage and RF power RF stations, RF valves and vacuum pumps, sensors and monitoring, reference signals, controls and feedback, cooling and ventilation, radiation issues and shielding, hardware safetyGo to contribution page
-
Bruno Vullierme (CERN)17/09/2009, 09:05Operating temperature options, extension of main RF vs. crab specific cryogenic lines, Helium pressure, cryo circuits and controls, safety valves and protection, overall installation effort and time line, heat loads, impact on the LHC during prototype tests and regular operationGo to contribution page
-
Mariusz Grecki (DESY)17/09/2009, 09:25General noise sources, amplitude and phase stability, tolerances, options for LLRF control, limitations, state of the art, crab specific signals/controls, integration with LHC main RF, testing, softwareGo to contribution page
-
Yoshihiro Funakoshi (KEK)17/09/2009, 09:45Streak camera and crossing angle measurements, crab cavity amplitude and phase control using closed orbit distortion, orbit offsets at IP and luminosity measurements, orbit control and feedback near crab cavities and other instrumentation used for crab operationGo to contribution page
-
17/09/2009, 10:05
Choose timezone
Your profile timezone: