16–18 Sept 2009
CERN
Europe/Zurich timezone

Session

Crab Cavity Integration

17 Sept 2009, 08:30
160/1-009 (CERN)

160/1-009

CERN

48
Show room on map

Presentation materials

There are no materials yet.

  1. Olivier Brunner (CERN)
    17/09/2009, 08:30
    Potential location for crabs in IR4 region, space constraints (longitudinal & transverse) for beam I and beam II, potential locations for cryogenic interfaces, power stations, transmission lines
    Go to contribution page
  2. Joachim Tuckmantel (CERN)
    17/09/2009, 08:45
    Cryomodule interfaces, transport, tunnel installation, alignment, high voltage and RF power RF stations, RF valves and vacuum pumps, sensors and monitoring, reference signals, controls and feedback, cooling and ventilation, radiation issues and shielding, hardware safety
    Go to contribution page
  3. Bruno Vullierme (CERN)
    17/09/2009, 09:05
    Operating temperature options, extension of main RF vs. crab specific cryogenic lines, Helium pressure, cryo circuits and controls, safety valves and protection, overall installation effort and time line, heat loads, impact on the LHC during prototype tests and regular operation
    Go to contribution page
  4. Mariusz Grecki (DESY)
    17/09/2009, 09:25
    General noise sources, amplitude and phase stability, tolerances, options for LLRF control, limitations, state of the art, crab specific signals/controls, integration with LHC main RF, testing, software
    Go to contribution page
  5. Yoshihiro Funakoshi (KEK)
    17/09/2009, 09:45
    Streak camera and crossing angle measurements, crab cavity amplitude and phase control using closed orbit distortion, orbit offsets at IP and luminosity measurements, orbit control and feedback near crab cavities and other instrumentation used for crab operation
    Go to contribution page
  6. 17/09/2009, 10:05
Building timetable...