ECR to prepare for EYETS 2016/2017:
o New BLMs – BE/BI
o 4 New tune pick-ups in 3L1 – BE/BI
o Enlargement of the shaft to transport the BT.BHZ10 and BTM.BHZ10 magnets – EN/HE
o Installation of new power converters for the new injection (Qstrip, Correctors, Quadrupoles, BI.BVT, stripping foil) – TE/EPC