wed 24/8
ATL-CSC will probably come for installation. Current position occupied by ATL-MM
CMS-RPC will probably come need to remove trolley.
Roberto request to open the bunker.
CMS-CSC vs ATL-RPC vs ATL-TGC vs ATL-MM
CMS-CSC will move out for a couple of days not to be in front of RPC (to be re-discussed)
Downstream area setups:
-1st half time: discussion about position and size (9 am)
-2ns half: beginning next week
CMS-DT and Roberto will check next Wednesday (9am) if it is possible to remove temporarily the rail after the CMS-DT beam period (leaving the rail in the bunker if it is not a problem for other users)
Thu 18/8
plan according to test beam.
CMS-RPC need access between 12-1pm
As discussed, I added here the last version of the draft from Dorothea concerning simulation and measurements we did last year.
Roberto