GIF++ installation and schedule meeting

→ Europe/Zurich
892/1-D20 (CERN)

892/1-D20

CERN

45
Show room on map
Roberto Guida (CERN)
    • 09:00 → 09:20
      Plan for test beam period (GIF & RD51) 20m

      beam sharing is discussed every day at 4pm (RD51 CR) for the next 24h.

      Katrina will join the meeting.

       

       

       

      this week:

      ATL-MM, RPC (until monday), CMS-RPC

      CMS-CSC (from Monday to Wednesday)

       

       

       

       

       

    • 09:20 → 09:40
      Plan for next wednesday (MD) / thursday (source scan) 20m

      wed 24/8

      ATL-CSC will probably come for installation. Current position occupied by ATL-MM

      CMS-RPC will probably come need to remove trolley.

      Roberto request to open the bunker.

       

      CMS-CSC vs ATL-RPC vs ATL-TGC vs ATL-MM

      CMS-CSC will move out for a couple of days not to be in front of RPC (to be re-discussed)

      Downstream area setups:

      -1st half time: discussion about position and size (9 am)

      -2ns half: beginning next week

       

      CMS-DT and Roberto will check next Wednesday (9am) if it is possible to remove temporarily the rail after the CMS-DT beam period (leaving the rail in the bunker if it is not a problem for other users)  

       

      Thu 18/8

      plan according to test beam.

      CMS-RPC need access between 12-1pm

    • 09:40 → 09:45
      Run coordinator 5m
      Speaker: Antonio Bianchi (Universita e INFN Torino (IT))
    • 09:45 → 10:00
      Duty cycle of the irradiator 15m
      Speaker: Antonio Bianchi (Universita e INFN Torino (IT))

      PAXN1646 = upstream

      PAXN1647 = downstream

    • 10:00 → 10:20
      Simulation of radiation field in the bunker 20m

      As discussed, I added here the last version of the draft from Dorothea concerning simulation and measurements we did last year.
      Roberto

      Speaker: Dorothea Pfeiffer (CERN)