Choose timezone
Your profile timezone:
This ECR describes the integration of four new tune Pick-Ups in the PS Booster in section 3L1. These new devices will replace the existing tune pick-ups by longer pick-ups, which would provide a better sensitivity to measure low intensity beams.
Space reservation for the installation of the new Finemet© Cavities (BRi.ACWF5L1), (LIU-PSB Project), in the building 360/U0-001 period 5L1.