    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-PS ECR PS-VC-EC-0001 (EDMS 1525018) Modification of the PS Ring MU41 and MU42 Vacuum Chambers 15m

      As part of the LIU project the injection kinetic energy of the PS will be increased from 1.4 to 2.0 GeV and a new injection septum will be required. To optimise the beam acceptance in the injection region, also the vacuum chambers inside the adjacent main dipoles need to be modified. Additionally, since the injection straight section will not provide sufficient space for the beam observation equipment anymore, so this equipment will have to be installed on these adjacent vacuum chambers.

      Speaker: Jan Hansen (CERN)
    • 16:25 → 16:40
      LIU-PS ECR PS-MDBCC-EC-0001 (EDMS 1725441) Installation of the 'IPM' Horizontal Magnet in SS82 of the PS Ring 15m

      The installation of the Beam Gas Ionisation Profile Monitor requires the installation of the 'IPM' horizontal magnet in SS82 which is described in this document.

      Speaker: Dominique Bodart (CERN)
    • 16:40 → 16:45
      AoB 5m