    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-PSB ECR PSB-BLM-EC-0002 (EDMS 1738405) Installation of a Beam Loss Monitoring System Based on FIC Detectors in the PSB 15m

      The existing Beam Loss Monitor System is based on Aluminium Cathode Electron Multiplier (ACEM) detectors and a 30 years old acquisition system. An upgrade is requested by the LIU project in order to add a new system based on flat ionization chambers (FIC) and a completely new acquisition and processing electronics. This system will be part of the BLM renovation in the PSB ring and adds 32 detectors in locations not previously monitored.

      Speakers: Dr Christos Zamantzas (CERN), William Vigano (CERN)
      ECR
    • 16:25 → 16:40
      LIU-PS ECR PS-BLM-EC-0001 (EDMS 1744274) Installation in the PS Ring of Beam Loss Monitoring Systems based on IC and Diamond Detectors 15m

      The existing Beam Loss Monitoring system is based on Aluminium Cathode Electron Multiplier (ACEM) detectors and a 30 years old acquisition system. An upgrade is requested by the LIU project in order to add a new system based on ionisation chambers (IC) and completely new acquisition and processing electronics for machine protection and optimisation, as wells as Diamond detectors connected to an OASIS based digitisation system for detailed observations. These systems will be part of the BLM renovation in the PS ring and adds 100 IC and 17 Diamond detectors in strategic locations around the machine.

      Speaker: Christos Zamantzas (CERN)
    • 16:40 → 16:55
      LIU-SPS ECR SPS-BLMD-EC-0001 (EDMS 1728369) Installation of a Beam Loss Diamond Detector in SPS LSS1 during EYETS 2016-2107 15m

      For the measurement of losses created at the scraper LSS1 of the SPS it is foreseen to
      install a diamond-based beam loss monitor downstream of BSHV.11772. The loss
      measurement should result in time resolved loss acquisitions for on and off-line studies
      of the process.
      (LIU-SPS BLM updgrade)

      Speakers: Christos Zamantzas (CERN), Lars Jensen (CERN)
      ECR
    • 16:55 → 17:10
      LIU-PS ECR PS-AC-EC-0001 (EDMS 1719437) Installation of a Fast Tuner for a 80MHz Cavity in SS08 (PR.C80.08) of the PS Ring 15m

      Installation of a fast tuner device, based on variable current biased ferrites, on a 80MHz cavity in SS08, in the frame of the LIU-PS project.

      Speaker: Carlo Rossi (CERN)
      ECR
    • 17:10 → 17:15
      AoB 5m
      • ECR CPS-R-EC-001 (EDMS 1731301) Installation of New Power Converters for the Transfer Line LT.BHZ20 Bending Magnet
      ECR