L4 BI Performance

  • All BI installed apart from
    • 4 WS that failed VSC acceptance - feed-through issue being solved
    • Devices to be put at HST location as of April 2017 for reliability run

• 2 SEM grids + 1 WS

• 2 BCTs

• 1 BPM

  • Laser Emittance Meter
    • Mechanics installation in May
    • Electronics commissioning in June
  • Status & Issues
    • BCT readings in front of dumps
    • SEM Grids
      • Some wires giving perturbed signals
      • Bad contacts suspected
    • LEBT SEM grids at source test stand
      • Removed with several broken wires
      • Refurbish in next weeks with new PCBs
      • Need to find way to interlock pulse length when grids in to avoid damage
    • WS
      • FESA server modified to allow PPM acquisition
      • Not used extensively in 2017 - needs further assessment
    • BPM
      • New SW for trajectory operational
      • Work on FESA server for Time of Flight in development
    • BSM
      • 2 monitors in expert mode
      • VME electronics & OP GUI to be made operational
    • BLM
      • Diamond BLMs - noise issue understood (cabling to OASIS)
      • Thresholds to be studied during reliability run
    • H0/H-
      • Large disturbances every 1.2s
        • Coming from bumper magnets
        • Stable for given bumper current
        • New VME card nearly ready hoping to solve major issues
      • Calibration on-going
    • HST-BTV
      • To observe beam & stripping foil
      • Minor mechanical issue leads to slightly tilted screen for IN position
        • Fixed for final installation
      • Several foils broken when moving BTV
        • Being investigated - not understood

Next Generation Rad-Hard Links

Near-term:

Standard Back-end - VFC

Standard Front-end - GEFE

GEFE Main components

  • VTRx
    • Rad hard optical transciever
    • Bi-directional at 4.8Gbps (Versatile link)
    • Available SM & MM
  • GBTx
    • Rad hard ASIC
    • Single electrical link with VTRx at 4.8Gbps
    • Multiple electrical links with front-end electronics

Back-end

  • SFP+ & GBT-FPGA
    • Based on commercial components
    • SFP+ - COTS bi-directional link at up to 10Gbps (SM or MM)
  • GBT-FPGA
    • HDL code emulating GBTx (Altera or Xilinx)

Longer-term (LS3 / HL-LHC):

Front-end:

  • VTRx+ single mode (SM)
    • MM under development by EP
    • SM under development by EP in collaboration with BI
  • LpGBTx+
    • Low power GBTx

VTRx+ SM

Current VTRx orders - 1000 for BI (500 for QP & 500 for BL - both foreseen for SPS)

  • InGaAs photodiode
  • Transimpedance amp
  • Laser & laser driver

Receiver Optical Sub-assembly - ROSA

  • Assembly for current generation ongoing
  • Could add production for future needs
    • Use R2E funds?

 

Transmitter Optical Sub-assembly - TOSA

  • Obsolete laser diode
  • MS done & test samples procured
  • Rad tolerance is main selection criterion
    • Tests planned for April 2017

Laser Driver

  • Current
    • GBLD v4.2 rad-hard ASIC
    • Can drive edge-emitting lasers & VCSELs
    • Max data rate 5Gbps
  • New driver
    • Can work up to 10Gbps
    • Only drives VCSELs SM (not many companies providing MM VCSELs)

ACTION:

  • BI to provide specifications
    • Specifications
      • Radiation tolerance?
      • Temperature range?
      • Max link-length & breakpoint number?
      • Magnetic field?
      • Do we need 10Gbps?
      • Rough estimation of number of modules
  • BI to liaise with CO

 

LpGBTx

Driver ASIC

  • Input/Output towards "optical link"
    • Downlink 2.56Gb/s
      • FEC12 encoding (can correct up to 12 errors)
    • Uplink 5.12 & 10.24 Gb/s
      • FEC12: 3.84 & 7.68 Gb/s
      • FEC5: 4.48 & 8.96 Gb/s
  • e-links
    • 16 links to front-ends
      • 80-320 Mb/s (16 - 4 links)
    • 28 links from front-end to ASIC
      • 160 - 1280 Mb/s (28 - 6 links)
    • Clock I/O
  • Fixed latency
  • Clock jitter < 5ps rms
  • Rad hardness 2MGy

ACTION:

Completion of production 2019.

Need input for mid-2018

  • ~30CHF per ASIC