◾Scope of the HL-LHC CV Review
◾New HL Infrastructure
◾Cooling Requirements
◾General Planning of the Project
◾Main Design Assumptions & Criteria
◾Introduction to C & V Presentations
Paul Pepinster
(CERN)
14/03/2017, 10:30
USER REQUIREMENTS
- Technical requirements
- Safety requirements
DESIGN CRITERIA
- Surface buildings:
- Thermal study
- Reference values
- Summer thermal balance
- Winter thermal balance
- Underground area:
- Required indoor conditions
- Guidelines / constraints
TECHNICAL DESCRIPTION
- Systems overview
- Ventilation design for surface...
Alexandre Joel Broche
(CERN)
14/03/2017, 15:10
◾Cooling infrastructure Point 1 and 5
◾User Requirements
◾Design Criteria
◾Cooling overview schematic
◾SFx7 Primary water station
◾SUx7 Chiller water station
◾UWx7 Underground cooling station
◾Central heating Point 1
Frederic Borralho
(CERN)
14/03/2017, 16:20
◾Advancement status of the integration of Cooling and Ventilation systems.