GIF++ installation and schedule meeting
Attendance:
—————
Martin J. (EP-DT)
Giuseppe P. (EP-DT)
Barbara A. (ATL-MM, ATL-MM-mod0)
Beatrice M. (EP-DT)
Marek Michal G. (CMS-GEM)
Francesco F. (CMS-GEM)
Katerina K. (CMS-CSC)
Korbinian Ralf Schmidt-Sommerfeld (ATL-MDT)
Maxime G. (CMS-RPC)
Henso A. (ATL-NSW-TGC)
Mara Corbetta (EP-DT-FS)
Vidyo:
Philipp Kahler
Daniel T. (CMS-DT)
Nicolas Z. (CMS-RPC)
--------
-
-
09:15
→
09:20
Weekly Summary 5mSpeaker: Maxime Gouzevitch (Universite Claude Bernard-Lyon I (FR))
-
09:20
→
09:25
Plans for today (source scan) & next wednesday access 5m
-
09:25
→
09:40
New requests for tests at GIF 15m
introduction, goal of the test, plan, needs
-
09:40
→
09:50
Intervention Weeks W12-W14 10m
Planning of the work surrounding the yearly Irradiator maintenance
20.03 MONDAY - Stop of Irradiator 9 h, opening of bunker
Start of clean up and detector removal (protection)21.03 TUESDAY - Opening of the roof (!) and removal of ground plate cosmic trigger
Collection of led bricksValve check (4h) for the following mixtures : Ar 70%+ C02 30%, Ar+CO2+CF4, Ar 93%+CO2 7%
22-29.03 Installation of upstream XTDV, opening of the floor
22-24.03 Installation of cosmic trigger chamber
Installation of GEM 2 services and cables
Scaffolding installation
Replace broken neon lights
27-29.03 Irradiator Maintenance27-29.03 RAMSES monitor relocation
27-30.03 Painting of led bricks
30.03 - DSO Test
31.03 - Move back to the bunker area ? (Maybe 30 before DSO ?)
03-06.04 BLM test campaign (4 days)
07.04 FRIDAY Restart of normal operation
--------------------------
In addition :
- Gas rack to be connected to final power
- Geometer measurement and floor / wall marking of radiation field (day to be defined)
--------------------------
Any other requests :
-
Gas requirements during Maintenance period 5m
Minimal requirements, e.g when moved to the preparation area
-
-
09:50
→
10:10
Beam Schedule 2017 20m
Version 1.01 (!) of the SPS North Area schedule released.
-
10:10
→
10:25
Infrastructure & Upgrades to the Facility - DT part 15m
Improvements needed or planned for the facility.
Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)Ongoing Projects :
- Upgrade of GIF Control System - Initial list submitted to DT controls group
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics-
Temperature at GIF 5m
Status / Plans / Interventions to address the low temperature problem currently seen inside and outside the bunker area
Speaker: Giuseppe Pezzullo (CERN)
-
10:25
→
10:40
Announcements 15m
-
IMPACTS for 2017 5m
Guidelines for filling in IMPACT requests
Guideline : One IMPACT per setup.
- two chambers on individual supports -> 2 IMPACT declarations
- multiple chambers swapped on same or similar support -> one IMPACT declaration
- basically, if you need two locations, please make two IMPACT declaration (clone)
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes). If your work is outside, please state the whole number of hours. -
Gas bill 2016 5m
-
AOB 5m
Any Other Business
Gas bill 2016 : please note that the EP-DT budget for GIF does not cover consumables.
Gas used at the GIF++ will have to be paid by the consumer. We will start the TID's soon.Question from Barbara : How is the Argon/CO2 provided, and will this be charged to the user.
To be clarified with Roberto & Fred.O2 contamination study - Roberto to comment.
-
-