Attendance:
—————
Martin J. (EP-DT)
Giuseppe P. (EP-DT)
Barbara A. (ATL-MM, ATL-MM-mod0)
Mara C. (EP-DT-FS) GEM-1
Marek Michal G. (CMS-GEM)
Francesco F. (CMS-GEM1)
Lisa B. (CMS-GEM2)
Katerina K. (CMS-CSC)
Victor P. (CMS-CSC)
Nicolas Z. (CMS-RPC)
Henso A. (ATL-NSW-TGC)
Luigi Benussi (CMS)
Vidyo:
----------
Korbinian Ralf Schmidt-Sommerfeld (ATL-MDT)
Chrysostomos Valderanis
Source Scan @ Thursday (today):
--------------------------------------------
BLM Test ongoing
Next Week Filter Scan on Tuesday AND Thursday :
Henso, Nicolas on Tuesday. 5h
Access requests this Friday :
-----------------------------------------
Fr. we open at 14h the bunker door - close before 17h
We open again on Wednesday Morning.
Recap of the Intervention weeks and follow up of open topics
20.03 MONDAY - Stop of Irradiator 9 h, opening of bunker
Start of clean up and detector removal (protection)
21.03 TUESDAY - Opening of the roof (!) and removal of ground plate cosmic trigger
Collection of led bricks
Valve check (4h) for the following mixtures : Ar 70%+ C02 30%, Ar+CO2+CF4, Ar 93%+CO2 7%
22-29.03 Installation of upstream XTDV, opening of the floor
22-24.03 Installation of cosmic trigger chamber
Installation of GEM 2 services and cables
Scaffolding installation
Replace broken neon lights
27-29.03 Irradiator Maintenance
27-29.03 RAMSES monitor relocation
27-30.03 Painting of led bricks
30.03 - DSO Test
31.03 - Move back to the bunker area ? (Maybe 30 before DSO ?)
03-06.04 BLM test campaign (4 days)
07.04 FRIDAY Restart of normal operation
--------------------------
In addition :
- Gas rack to be connected to final power
- Geometer measurement and floor / wall marking of radiation field (day to be defined)
--------------------------
Any other requests :
introduction, goal of the test, plan, needs
Improvements needed or planned for the facility.
Ongoing Projects :
You can subscribe to the calendar with the following link (to be added in you calendar application)
http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics
Status / Plans / Interventions to address the low temperature problem currently seen inside and outside the bunker area
Guidelines for filling in IMPACT requests
Guideline : One IMPACT per setup.
Each Setup should have IMPACT label attached with number.
Attached documents : CAD file or picture.
Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes). If your work is outside, please state the whole number of hours.
Any Other Business
Gas bill 2016 : please note that the EP-DT budget for GIF does not cover consumables.
Gas used at the GIF++ will have to be paid by the consumer. We will start the TID's soon.
Question from Barbara : How is the Argon/CO2 provided, and will this be charged to the user.
To be clarified with Roberto & Fred.
O2 contamination study - Roberto to comment.