09:00
|
Introduction (CERN)
|
|
09:10
|
Presentation of D2 short model ( layout, dimensions, interfaces, cables, structure design) (INFN)
|
|
09:30
|
Magnetic measurement requirements, (INFN) discussion on hardware adaptation, actions (CERN)
|
|
09:50
|
Presentation of vertical test cryostat, main interfaces, common mechanical adaptation, (CERN TF)
|
|
10:05
|
Instrumentation table by INFN, discussions (all)
|
|
10:20
|
Discussion on DAQ instrumentation interface : connectors types (QHs, VTs, SG, TS) , leads lengths, number of channels (CERN TF, EN-MME M Guinchard)
|
|
10:40
|
Optical strain fiber experience on MQX, discussion coil OF sensing proposal ( A. Chiuchiolo)
|
|
10:50
|
Discussion on interface preparation of coils, cryostat ( structure preload, splices on leads, Cryostat interface flange, …) (INFN, CERN)
|
|
11:10
|
QA Hi-Voltage test before transport ( INFN) , at reception and after CD test (CERN)
|
|
11:25
|
Quench protection test interface, Common Test scenario plan proposal (CERN, MSC TF,LMF), discussion all.
|
|
11:40
|
Overall updated SM coil Schedule (INFN)
|
|
11:50
|
AOB
|