CLIC Experimental and Breakdown Studies
Breakdown studies meeting 18.07.2017
Present: Walter Wuensch, Noora-Mari Pienimaki, Iaroslava Profatilova, Jan Paszkiewicz, Enrique Rodriguez Castro.
Remote connected by Vidyo: Anton Saressalo and Andreas Kyritsakis from University of Helsinki, Sagy Lachmann and Eli Engelberg from The Hebrew University of Jerusalem.
Speakers: Sagy Lachmann, Iaroslava Profatilova, Jan Paszkiewicz.
Link to indico page https://indico.cern.ch/event/651521/
Agenda
1. Sagy Lachmann (by Vidyo) "Splitting in pre-breakdown dark currents”. Sagy shown the result from analysis of data from DC-spark system II, (tip-plate geometry of electrodes). The data was taken with 1 ns resolution in a range of 10 us for each measurements. The method of analysis was described. The difference in the range for mean current vs fit quality for applied voltage of 600 and 700 V was shown. The analysis of splitting stage at data also shown. More data from the tests are required for finding more correlations.
Tasks: to analyse data from Large Electrodes System to verify if it possible to find some correlation for large surface, or we need to come back and measure dark current for this aim as previously at DC spark system II.
2. Iaroslava Profatilova "Dark current measurements in Large Electrodes System”. The results from mean values of current taken with Large Electrodes System were shown. The tests were done with 60 um gap at both vacuum chambers. In LES 2 – SS anode and Cu Ag cathode from SLAC and in LES 3 – Nb anode and cathode. The current for Nb is bigger than for SS CuAg electrodes.
Task: to clarify the method of measurement. Plot current voltage diagrams with voltage at power supply at X-axis.
3. Jan Paszkiewicz “Dark current measurements at Xbox1”. The raw and filtered dark current signals were shown. The measurement of current during the tests provides the data for field enchantment factor calculation (betta). The difference in fluctuation of dark current during test is not visible with available equipment at the Lab.
4. The plans for Pulsed Dc system were discussed:
a) 2 couples of Cu electrodes (62 mm diameter) were sending to follow “bonding” procedure together with Accelerating structures. After this they need to follow backing procedure at CERN. 1 couple will be set to LES 3 instead of 006 Nb, another could be send to Helsinki.
b) New Cu electrodes (62 mm, 42 mm diameters and designed for BD localization technique are arrived to CERN, followed metrology. Next step – to clean them. 1 set will be set to LES 2 instead of 005 SLAC SS CuAg. Some other of electrodes need to follow heat treatment as during “bonding” procedure, and after – backing.
c) As one of future test, the comparison of Electrical breakdown field for different materials need to be done at Large Electrodes System.
Next Breakdown meeting will be on August, 1.