LIU - Planning & Installation meeting

→ Europe/Zurich
864/1-B04 (CERN)

864/1-B04

CERN

22
Show room on map
    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-IONS ECR L3-BCFAB-EC-0002 (EDMS 1842401) Change of a Faraday Cup in the ITFS line in LINAC3 15m

      The proposed upgrade concerns the replacement of the existing ITFS LINAC3 Faraday Cup, not operational since at least one year, with a new detector.

      Speakers: Federico Roncarolo (CERN), Sergey Sadovich (The Joint Institute for Power and Nuclear Research - SOSNY (BY)), William Andreazza (CERN)
    • 16:25 → 16:40
      LIU-IONS ECR L3-LJ-EC-0003 (EDMS 1834310) Displacement of Steerer Magnet ITL.DHZ01/DVT01 in Linac 3 15m

      The steerer magnet ITL.DHZ01/DVT01 (type MCCADWAC) will be moved to another position in the LEBT to optimize the beam steering in this line.

      Speakers: Detlef Kuchler (CERN), Dominique Bodart (CERN)
    • 16:40 → 16:55
      LIU-IONS ECR L3-R-EC-0002 (EDMS 1841822) Installation of MAXIDISCAP Power Converters for Linac3 and LEIR Transfer Line Pulsed Quadrupoles 15m

      The power converters for the Linac3 and LEIR transfer line pulsed quadrupoles will be modified to allow the upgrade of their control from MIL-1553 to FGC3.

      Speakers: Jean-Marc Cravero (CERN), Stephane Joffe (CERN)
    • 16:55 → 17:00
      AoB 5m
      • ECR L3-R-EC-0001 (EDMS 1841776) Installation of MIDIDISCAP Power Converters for Linac3 and LEIR Transfer Line Pulsed Steerers 5m

        The power converters for the Linac3 and LEIR transfer line pulsed steerer magnets will be replaced for consolidation purpose and to allow the upgrade of their control from MIL-1553 to FGC3.

        Speaker: Jean-Marc Cravero (CERN)