LIU - Planning & Installation meeting

→ Europe/Zurich
376/1-020 (CERN)

376/1-020

CERN

16
Show room on map
    • 16:00 → 16:05
      Approval of the minutes 5m
      Speaker: Julie Coupard (CERN)
    • 16:05 → 16:10
      LIU-PLI Follow-up 5m
      • Follow-up on the SRRs and ECRs
      Speaker: Julie Coupard (CERN)
    • 16:10 → 16:25
      LIU-PSB ECR CPS-LJ-EC-0003 (EDMS 1688400) Partial Dismantling of LINAC 2 15m

      This document concerns the disassembly of the Linac2 transfer line from the end of the DTL cavities, DTL cavities not included, up to the LT.BHZ20 magnet. The aim is to liberate space for new items installation (bldg.363/R-402), described in the ECR: CPS-LJ-EC-0002 "Connection of the Linac4 to the LT.BHZ20"

      Speaker: Aurelio Berjillos Barranco (CERN)
    • 16:25 → 16:40
      LIU-PSB ECR CPS-LJ-EC-0005 (EDMS 1805620) LBE Line and Infrastructure Upgrade for the Linac4 15m

      This document, with CPS-LJ-EC-0002 & CPS-LJ-EC-0003, concerns the Linac4 connection with the PSB injection transfer line. The present LBE line shall be adapted to the 160 MeV H- transverse emittances of Linac4 beam replacing most of its equipment and installing new auxiliary infrastructure in the area.

      Speaker: Aurelio Berjillos Barranco (CERN)
    • 16:55 → 17:00
      AoB 5m