Choose timezone
Your profile timezone:
This document concerns the disassembly of the Linac2 transfer line from the end of the DTL cavities, DTL cavities not included, up to the LT.BHZ20 magnet. The aim is to liberate space for new items installation (bldg.363/R-402), described in the ECR: CPS-LJ-EC-0002 "Connection of the Linac4 to the LT.BHZ20"
This document, with CPS-LJ-EC-0002 & CPS-LJ-EC-0003, concerns the Linac4 connection with the PSB injection transfer line. The present LBE line shall be adapted to the 160 MeV H- transverse emittances of Linac4 beam replacing most of its equipment and installing new auxiliary infrastructure in the area.