LIU - Planning & Installation meeting
-
-
14:00
→
14:05
Approval of the minutes 5mSpeaker: Julie Coupard (CERN)
-
14:05
→
14:10
LIU-PLI Follow-up 5m
- Follow-up on the SRRs and ECRs
Speaker: Julie Coupard (CERN) -
14:10
→
14:25
LIU-SPS ECR SPS-A-EC-0001 (EDMS1900971) LSS3 for upgrade of the 200 MHz RF system 15m
This ECR is part of the LHC Injectors upgrade (LIU) framework, which covers SPS, and seeks to prepare the reliable delivery of the required beams to the LHC, to meet the goals of the High Luminosity LHC (HL-LHC) project. It concerns LSS3 of the SPS, for positions 31410 through 32210.
Part of the SPS upgrade project concerns the upgrade of the 200 MHz RF system, which is the frequency at which main accelerating system of the SPS operates. This involves the addition of two new travelling-wave cavities and the construction of two new RF systems that will feed them, as well as the installation of the surrounding equipment to ensure the correct functioning of said systems. The two ECR dedicated to the required changes from GT10 until LSS3 including PA3 and TA3 for the upgrade of the 200 MHz RF System have been already published [1], [2].
This ECR is based on the SRR [3] already approved.
Installation foreseen during the LS2.
Speakers: Eric Montesinos (CERN), Pilar Parrado Caballero (Ministere des affaires etrangeres et europeennes (FR)), Sebastien Jerome Calvo (CERN) -
14:25
→
14:40
LIU-SPS ECR SPS-LJ-EC-0013 (EDMS1894326) New RF power feeder lines in SPS point 3 (TA3 and LSS*) for LIU-SPS 15m
This ECR is part of the LHC Injectors upgrade (LIU) framework, which covers SPS, and seeks to prepare the reliable delivery of the required beams to the LHC, to meet the goals of the High Luminosity LHC (HL-LHC) project.
Part of the SPS upgrade project concerns the upgrade of the 200 MHz RF system, which is the frequency at which main accelerating system of the SPS operates. This involves the addition of two new travelling-wave cavities and the construction of two new RF systems that will feed them, as well as the installation of the surrounding equipment to ensure the correct functioning of said systems. The required changes are divided in several parts with related ECRs to describe the changes in surface, shaft and the tunnel. The corresponding SRR has been already approved [1].
This ECR is dedicated to the required changes in the TA3 and LSS3 for the upgrade of the 200 MHz RF System. The ECR dedicated to the changes in the shaft (PA3) and in the technical gallery (GT10) has been already approved [2].
Speakers: Eric Montesinos (CERN), Pilar Parrado Caballero (Ministere des affaires etrangeres et europeennes (FR)), Sebastien Jerome Calvo (CERN) -
14:40
→
14:55
LIU-SPS ECR SPS-R-EC-0003 (EDMS1874303) Power converter modifications in building BA1 required by LIU-SPS 15m
In order to comply with the framework of SPS Beam dump relocation, the actual BA1 converters layout shall be modified as described in this document.
Plan number: 11103.Speaker: Emilien Coulot (CERN) -
14:55
→
15:10
LIU-SPS ECR SPS-R-EC-0001 (EDMS1874304) Power converter modifications in building BA5 required by LIU-SPS 15m
In order to comply with the framework of SPS Beam dump relocation, the actual BA5 converters layout shall be modified as described in this document.
Plan number: 11103Speaker: Emilien Coulot (CERN) -
15:10
→
15:15
AoB 5m
-