As part of the LIU project the injection kinetic energy of the PS will be increased from 1.4 to 2.0 GeV. To optimise the beam acceptance in the injection region a new injection septum will be required, the vacuum chamber inside the adjacent downstream main dipole (MU41) has already been modified accordingly.
Since the injection straight section will not provide sufficient space for the present beam observation equipment PI.BTV42, a dedicated location on the vacuum chamber of MU41 has been identified. The installation of the new BTV is foreseen for LS2. However, if the device is ready to be installed before, the installation during YETS 2017/18 can be envisaged.