GIF++ installation and schedule meeting

→ Europe/Zurich
892/1-D20 (CERN)

892/1-D20

CERN

45
Show room on map
Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

Attendance:
————

Giuseppe (DT-DD)
Martin (DT-DD)
Mara C. (DT)

Sergio (CMS-DT)

Katerina K. (CMS-CSC)

Vidyo:
----------

Bini  (ATL-MDT)
Eduardo (ATL-MM)

 

There are minutes attached to this event. Show them.
    • 09:15 → 09:25
      Review of last week operation & plans for this week 10m

      CMS - DT  : started to use absorbtion factor 15

      Filterscan :
      Downstream : after meeting until 17h
      Upstream : no rerquest

      Short access - after meeting.

      Monday : Morning Few 10 minute source off (CMS-CSC)

      Drop in atmospheric pressure on Sunday. Also seen on REMUS ?
      to be followed up.

      Pressure inside bunker - recalibrate sensor, dedicated measurement planned.


       

    • 09:25 → 09:40
      Planning for the comming weeks 15m
      • Report from Downstream Field 5m
      • Report from Upstream Field 5m
    • 09:40 → 09:50
      New requests for tests at GIF 10m

      introduction, goal of the test, plan, needs

      ALICE electronic board to return for 1-2 weeks. we will try to host it in the upstream area this time, possible hosted by the ATL-MM  - no news

       

       

    • 09:50 → 10:05
      Infrastructure & Upgrades to the Facility 15m

      Improvements needed or planned for the facility.

      Speakers: Giuseppe Pezzullo (CERN), Martin Richard Jaekel (CERN)

      Ongoing Projects :

      Connection of gas system values to GIF Control System :   DONE !

      Installation of Temperature and Humidity sensor in Gas Rack area : DONE !

      Retrieval of TIMBER values : Work in progress, but already available in beta version
      Test site : http://epdtdi-vm-01.cern.ch:8080/pytimber

      Additional values need to be collected/republished ?
              - REMUS
              - XTDV ?
              - ????

       

      • Material Door Installation 5m

        Crane should become operational this week.

        We try to re-schedule the installation as soon as possible, potentially next week.

      • Upcoming Interventions 5m

        22.11  AUG/AUL buttons not operational.

        Access System not operational : 18-20 December -> SOURCE OFF

        ANNUAL AUG TEST will be the Tue. 9. Jan. -> We therefore restart normal operation after Christmas break at Tuesday Lunch time

        Local AUG test : 5-7 March. Will be announced in more details when closer to the test.

         

      • Requirements during YETS and LS2 5m

        YETS :  Cooling stop for basically the full end of the year stop.
        However, minimal cooling will be provided by EN-CV via special solution.

    • 10:05 → 10:15
      Announcements 10m

      You can subscribe to the calendar with the following link (to be added in you calendar application)
      http://mmm.cern.ch/owa/calendar/fad3257aa1c74520bd63ea8f3d126245@cern.ch/b2719d8034af4743a801cdd73f3b969315436460478832573385/calendar.ics

      • IMPACTS for 2018 5m

        Guidelines for filling in IMPACT requests

        General Guideline : One IMPACT per setup.

        • two chambers on individual supports -> 2 IMPACT declarations
        • multiple chambers swapped on same or similar support -> one IMPACT declaration
        • basically, if you need two locations, please make two IMPACT declaration (clone)

        Each Setup should have IMPACT label attached with number.
        Attached documents : CAD file  or  picture.
        Review working hours : if your declaration includes the bunker area, please state the number of hours you want to stay INSIDE the bunker only (for RP purposes).

        NEW IMPACT needed for 2018. (All current IMPACTS will expire at Saturday 23.December)

        Special IMPACT needed for Christmas Closure.

      • New Announcements 5m
      • AOB 5m

        Gas  bill 2016 : please note that the EP-DT budget for GIF does not cover consumables.
        Gas used at the GIF++ will have to be paid by the consumer. We will start the TID's soon.

        Question from Barbara : How is the Argon/CO2 provided, and will this be charged to the user.
        To be clarified with Roberto & Fred.

        O2 contamination study - Roberto to comment.